Orange County NC Website
063 <br /> ORANGE COUNTY <br /> HILLSBOROUGH <br /> NORTH CAROLINA <br /> ediganaget effiez EstaStisimd 175z <br /> March 21, 1983 <br /> - Subject: Request for Proposals <br /> Cheeks Township Water/Sewer Extension Report and <br /> Upper Eno Reservoir Development REasibility Report <br /> Gentlemen; <br /> You are invited to su1mit a proposal for professional engineering services for the <br /> Cheeks Township Water/Sewer Extension Report and Upper Eno Reservoir Development <br /> Feasibility Report. proposals for the project, which should be based on a lump sum <br /> or total cost method, will be received by the Director of Planning, The Orange County <br /> Board of Commissioners' will review all proposals received and award the project based <br /> on the selection criteria outlined below. In order to be considered, complete proposals <br /> must be submitted in a sealed envelope and received no later than 2:00 p.m. on May 13, 1983. <br /> 1983. Proposals, if mailed, must be addressed to: <br /> 1 . <br /> Marvin E. Collins <br /> Planning Director - "- -------. <br /> County of Orange <br /> , 106 E. Margaret Lane <br /> Hillsborough, N. C. 27278 <br /> Proposals which are haid delivered must be deliVered to the Office of the Planning <br /> Director located at the Orange County Courthouse at 106 East Margaret Lane in Hillsborough, <br /> N. C. For additional information concerning this project or for clarifications of any <br /> kind please contact Na -vin E. Collins, Planning Director, by phone at (919) 732-8181 or <br /> in person at the above'address. <br /> The minimum basic criteria which the Orange County Board of Commissioners will utilize <br /> in selecting the most qualified engineering consultant for this project are as follows: <br /> Specialized experience and technical competence of the firm and its <br /> personnel 1(including a joint venture, association or professional <br /> subcontraqt), considering the type of service required and the <br /> complexity1 of the project. <br /> Past record of performance on contracts with the County, other <br /> government" agencies or public bodies, and with private industry, <br /> including such factors as control of costs, quality of work, and <br /> ability to meet schedules. <br />