Browse
Search
Agenda - 04-19-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 04-19-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 4:45:20 PM
Creation date
4/18/2017 2:13:43 PM
Metadata
Fields
Template:
BOCC
Date
4/19/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830419
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06(• <br /> 4 <br /> • <br /> CONSULTANTS: As described in ALA Document B 141, Basic Services shall <br /> include engineering and other necessary consultants' services. <br /> STRUCTURAL ENGINEERS: W. H. Gardner, Jr. Associates <br /> • Durham, North Carolina <br /> MECHANICAL AND <br /> ELECTRICAL ENGINEERS: To be selected. <br /> COMPENSATION FOR BASIC SERVICES <br /> For Basic Services agreed upon by the Owner and Architect, compensation <br /> shall be Computed on the basis of PerCentage of Construction Cost at the <br /> rates described below: <br /> -• • " <br /> • -ANTICIPATED CONSTRUCTION COSTS - $280,000 - $350,000 <br /> v•L.. I : ' <br /> FEES IFOR BASIC SERVICES: Computed at the rate on a decreasing scale <br /> 19.757. for the $280,000 construction cost to 9.257, for the <br /> - 4350,000 amount, with proportional adjustments to the rate for con- <br /> 1 <br /> 6trucpion costs within the stated range. <br /> ••• <br /> RESPONSIBILITIES OF PRINCIPALS <br /> r <br /> , V <br /> Roman Kolodij - Architect in charge of Project Design, Development <br /> and Execution. <br /> James M. Webb - Design and Historic Context Consultation; liaison <br /> with Historical Review Boards and Department of Archives and History. <br /> Technical Staff - Two draftsmen. Additional staff to meet scheduling <br /> requirements. <br /> Respectfully submitted, <br /> Roman Kolodij James M. Webb Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.