Browse
Search
Agenda - 04-19-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 04-19-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 4:45:20 PM
Creation date
4/18/2017 2:13:43 PM
Metadata
Fields
Template:
BOCC
Date
4/19/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830419
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
---7.-----"P•m"P'""'"••■•••••1 <br /> 1 - <br /> , . <br /> 053. , <br /> . . , • <br /> , • . <br /> __________ . _. • ....._. ________, _...______________.,... _ <br /> , 1 <br /> 1 <br /> with the fixed limit.The providing of such service shall be or extended through no fault of the Architect, compensa- <br /> the limit of the Architect's responsibility arising from the tion for any Basic Services required for such extended <br /> establishment of such fixed limit,and having done so, the period of Administration of the Construction Contract <br /> Architect shall be entitled to compensation for all services shall be computed as set forth in Paragraph 14.4 for Addi- <br /> performed, in accordance with this Agreement, whether tional Services. <br /> or not the Construction Phase is commenced. 6.1.4 When compensation is based on a percentage of <br /> 1 • <br /> I Construction Cost, and any portions of the Project are - <br /> ARTICLE 4 deleted or otherwise not constructed, compensation for <br /> DIRECT PERSONNEL EXPENSE such portions of the Project shall be payable to the extent <br /> i services are performed on such portions, in accordance <br /> 4.1 Direct Personnel Expense i <br /> ' s defined as the direct sal- with the schedule set forth in Subparagraph 14.22, based <br /> aries of all the Architect's personnel engaged on the Proj- on (1) the lowest bona fide bid or negotiated proposal or, <br /> ect, and the portion of the cost of their mandatory and (2) if no such bid or proposal is received, the most recent <br /> customary contributions and benefits related thereto,such Statement of Probable Construction Cost or Detailed Esti- <br /> as employment taxes and other statutory employee bene- mate of Construction Cost for such portions of the Project. <br /> fits, insurance, sick leave, holidays, vacations, pensions 6.2 PAYMENTS ON ACCOUNT OF <br /> and similar contributions and benefits. ADDMONAL sumas <br /> 6.2.1 Payments on account of the Architect's Additional <br /> ARTICLE 5 <br /> Services as defined in Paragraph 1.7 and for Reimbursable <br /> 7— <br /> REIMBURSABLE EXPENSES Expenses as defined in Article S shall be made monthly <br /> 5.1 Reimbursable Expenses arupon presentation of the Architect's statement of services <br /> e I in addition to the Com- rendered or expenses incurred. <br /> pensation for Basic and Additional Services and include <br /> actual expenditures made by the Architect and the Archi- <br /> 6.3 PAYMENTS WITHHELD <br /> tect's employees and consultants in the interest of the 6.3.1 No deductions shall be made from the Architect's <br /> Project for the expenses listed in the following Sub- compensation on account of penalty, liquidated damages <br /> paragraphs: I or other sums withheld from payments to contractors, or <br /> 5.1.1 Expense of transportation' in connection with the on account of the cost of changes in the Work other than <br /> Project; living expenses in connection with out-of-town those for which the Architect is held legally liable. <br /> travel; long distance communiations, and fees paid for 6.4 PROTECT SUSPENSION OR TERMINATION <br /> securing approval of authorities having jurisdiction over <br /> 6.4.1 If the Project is suspended or abandoned in whole <br /> the Project. <br /> shall <br /> or in part for more than three months, the Architect <br /> 5.1.2 Expense of reproduction , postage and handling of be compensated for all services performed prior to receipt <br /> Drawings, Specifications and other documents, excluding of written notice from the Owner of such suspension or <br /> reproductions for the office use of the Architect and the abandonment, together with Reimbursable Expenses then <br /> Architect's consultants, due and all Termination Expenses as defined in Paragraph <br /> 5.1.3 Expense of data processing and photographic pro- 10.4, If the Project is resumed after being suspended for <br /> duction techniques when used in connection with Addi- more than three months, the Architect's compensation <br /> I <br /> shall be equitably adjusted. • <br /> tional Services. <br /> I <br /> 5.1.4 If authorized in advance by the Owner,expense of <br /> overtime work requiring higher than regular rates. ARTICLE 7 <br /> —_-. <br /> I <br /> 5.1.5 Expense of renderings, models and mock-ups re- <br /> , ARCHITECT'S ACCOUNTING RECORDS <br /> quested by the Owner. <br /> I 7.1 Records of Reimbursable Expenses and expenses per- <br /> 5.1 Expense pense of any additional insurance coverage or <br /> mining to Additional Services and services performed on <br /> limits, including professional liability insurance, requested <br /> the basis of a Multiple of Direct Personnel Expense shall <br /> by the Owner in excess of that normally carried by the <br /> be kept on the basis of generally accepted accounting <br /> Architect and the Architect's consultants. <br /> principles and shall be available to the Owner or the <br /> Owner's authorized representative at mutually convenient <br /> ARTICLE 6 times. <br /> 1 <br /> PAYMENTS TO THE ARCHITECT <br /> RTICLE 8 <br /> 6.1 PAYMENTS ON ACCOUNT OF BASIC SERVICES <br /> I OWNERSHIP AND USE OF DOCUMENTS <br /> 6.1.1 An initial payment as set forth in Paragraph 14.1 is <br /> the 8.1 Drawings and Specifications as instruments of cere- <br /> e minimum payment under thi Agreement. <br /> :..... ....... ........1 I_ It <br />
The URL can be used to link to this page
Your browser does not support the video tag.