Orange County NC Website
'1• .. ., :+•- ':;y. .?;,y'-' . rt �;rte <br /> 1.7.1 Providing analyses oqf the Owner's needs, and pro- struction, and furnishing services as may be required in <br /> gramming the requirements of the Project. connection with the replacement of such Work. <br /> 1.7.2 Providing financial feasibility or other special 1.7.16 Providing services made necessary by the default <br /> studies. of the Contractor, or <br /> by major defects or deficiencies in <br /> 1.7.3 Providing planning surveys, site evaluations, envi- the Work of the Contractor,or by failure of performance <br /> ronmental studies or comparative studies of prospective of either the Owner or Contractor under the Contract for <br /> sites, and preparing special surveys, studies and submis- Construction. <br /> sions required for approval's of governmental authorities 1.7.17 Preparing a set of reproducible record drawings <br /> or others having jurisdiction)I over the Project showing significant changes in the Work made during <br /> 1.7.4 Providing services rdlative to future facilities, sys- construction based on marked-up prints, drawings and <br /> terns and equipment whic1�are not intended to be other data furnished by the Contractor to the Architect <br /> con- <br /> structed during the ConstruiL-tr'on Phase. 1.7.18 Providing extensive assistance in the utilization of <br /> 7J5 Providing services to investigate existing conditions any equipment or system such as initial start-up or testing, <br /> or facilities or to make measured drawings thereof, or to maintenance and balancing,training preparation ne of operation operation <br /> and <br /> verify the accuracy of drawin or other information fur- main ainten me,and, training personnel for operation <br /> Wished by the Owner. and maintenance, and consultation during operation. <br /> 1.7.6 Preparing documents of alternate, se orate or 1.7.19 Providing services after issuance to the Owner of <br /> separate the final Certificate for Payment, or in the absence of a <br /> sequential bids or providing extra services in connection final Certificate for Payment, more than sixty days after <br /> with bidding, negotiation or construction prior to the the Date of Substantial Completion of the Work. <br /> completion of the Construction Documents Phase, when <br /> requested by the Owner. 1.7.20 Preparing to serve or serving as an expert witness <br /> requested in connection with any public hearing, arbitration pro- <br /> 1.7.7 g coordination of Work performed by ceeding or legal proceeding. <br /> separate contractors or by the Owner's own forces. 1.7.21 Providing services of consultants for other than <br /> 1.7.8 Providing services in connection with the work of the normal architectural, structural, mechanical and elec- <br /> a construction manager or eparate consultants retained trical engineering services for the Project <br /> by the Owner. 1.7.22 Providing any other services not otherwise in- <br /> 1.7.9 Providing Detailed Es mates Of Construction Cost, ducted in this Agreement or not customarily furnished in <br /> analyses of owning and operating costs,or detailed quan- accordance with generally accepted architectural practice. <br /> city surveys or inventories of material, equipment and <br /> labor. 7B TIi1tiE <br /> 1.7.10 Providing interior design and other similar ser- 1.8.1 The Architect shall perform Basic and Additional <br /> Servuces <br /> vices required for or in connection with the selection, as expeditiously as is consistent with professional <br /> procurement or installation of furniture, furnishings and rein and care and the, the progress Architect a the Wotkf for he <br /> related equipment. request of the Owner, the Architect shall submit for the <br /> E Owner's approval, a schedule for the performance of the <br /> 1.7.11 Providing services for planning tenant or rental Architect's services which shall be adjusted as required as <br /> spaces, the Project proceeds,and shall include allowances for peri- <br /> 7J.72 Making revisions in Drawings, Specifications or ods of time required for the Owner's review and approver <br /> other documents when such revisions are inconsistent of submissions and for approvals of authorities having <br /> with written approvals or instructions previously given, by the Owner,jurisdiction over the Protect.This schedulo when approved <br /> are required by the enactment or revision of codes, laws shah not, except for reasonable cause, Le <br /> or regulations subsequent to the preparation of such dog exceeded by the Architect. <br /> uments or are due to other Causes not solely within the <br /> control of the Architect. ARTICLE 2 <br /> 1.7.13 Preparing Drawings,Specifications and supporting OWNERS, <br /> data and providing other services in connection with THE RESPONSIBILITIES <br /> Change Orders to the extent I that the adjustment in the 2.1 The Owner shall provide full information regarding <br /> Basic Compensation resulting from the adjusted Con- requirements for t}ie Project including a program, which <br /> struction Cost is not commensurate with the services re- shall set forth the Owner's design objectives, constraints <br /> quired of the Architect,provided such Change Orders are and criteria, including space requirements and relation- <br /> required by causes not sole) within the control of the ships, flexibility and expandability,special equipment and <br /> Architect. systems and site requirements, <br /> inven- <br /> 2.2 If the Owner pravieje s a budget for the Project it <br /> 1.7.14 Making investigations surveys, valuations, <br /> tories or detailed appraisals of]existing facilities, and serv- shall include contingencies for bidding, changes in the <br /> ices reauirart in ennnO.-•G.... ....•L ».._.. �Al...l. _7..._r__ <br />