Browse
Search
2017-136-E AMS - Tibbens Construction to install door between new single occupancy restroom and locker room
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-136-E AMS - Tibbens Construction to install door between new single occupancy restroom and locker room
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 12:09:35 PM
Creation date
4/18/2017 9:13:32 AM
Metadata
Fields
Template:
Contract
Date
4/10/2017
Contract Starting Date
4/10/2017
Contract Ending Date
6/30/2017
Contract Document Type
Agreement - Construction
Amount
$2,500.00
Document Relationships
R 2017-136-E AMS - Tibbens Construction to install door between new single occupancy restroom and locker room
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6CBDC816-7157-47E6-991 B-C295A7AB3612 <br /> Proposal # 1103 <br /> FROM: Tibbens Construction Page. No. 1 of 1 <br /> 849 Moose Tracks Trl. <br /> Cedar Grove, NC 27231 <br /> 919-643-2856 c#919-667-5366 <br /> PROPOSAL SUBMITTED TO: <br /> Name: Orange County NC. <br /> Job location: OC solid waste Eubanks RD Chapel hill ( Bathroom Renovations) <br /> Phone: 919-245-2648 Asset management <br /> Street: PO box 8181 <br /> City: Hillsborough <br /> State: NC. 27278 <br /> Description of work to be performed: <br /> Provide and install (1) additional - 3' x 6' x 8" door leading into locker room of rear corridor <br /> bathroom. Match existing door, hardware, and finish. <br /> Exclusion: Door will not have a closure device. <br /> The existing wall opening will be altered for installation. <br /> The walls and trim colors will match existing. <br /> All of the work is to be completed in a substantial and workman like manner for the sum of Two <br /> Thousand Five Hundred Dollars ($2,500.00). The entire amount of the contract is to be paid <br /> within 30 days after completion. <br /> Any alterations or deviation from the above specifications involving extra cost of material or <br /> labor will be executed upon written order for same, and will become an extra charge over the <br /> sum mentioned in this contract. All agreements must be made in writing. <br /> Authorized Signature Mark Tibbens <br /> ACCEPTANCE <br /> You are hereby authorized to furnish all materials and labor required to complete the work <br /> mentioned in the above proposal for which Owner agrees to pay the amount mentioned in said <br /> proposal and according to the terms thereof. <br /> Signature Date <br /> www.socrates.com Page 1 of 1 SS4301-340•Rev.05/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.