Browse
Search
Agenda - 04-18-2017 - 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 04-18-2017 - Regular Mtg.
>
Agenda - 04-18-2017 - 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 7:27:45 AM
Creation date
4/18/2017 7:25:55 AM
Metadata
Fields
Template:
BOCC
Date
4/18/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 04-18-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> 1 to be added to the grandfathering resolution. The suggested additional language essentially <br /> 2 would allow projects of 90-units in size or greater to be subject to 2016 impact fee levels if the <br /> 3 project: <br /> 4 • Had obtained a specific lesser level of permitting than the currently required Zoning <br /> 5 Compliance Permit (ZCP) by January 1, 2017, and <br /> 6 • Submits a building permit application prior to January 31, 2019 (current date for this <br /> 7 milestone is January 1, 2018). <br /> 8 Additionally, the suggested language would require payment of the fee prior to December 31, <br /> 9 2020 (the current language requires the fee be paid by June 30, 2019). The suggested <br /> 10 language keeps the current "outer limit" of December 31, 2020 for issuance of a Certificate of <br /> 11 Compliance (formerly known as a Certificate of Occupancy). <br /> 12 <br /> 13 The petition was referred to staff to gather further information on the project. Staff <br /> 14 worked on the petition and tentatively scheduled the grandfathering request for hearing <br /> 15 at the April 18, 2017 regular meeting of the BOCC. Before the BOCC could consider the <br /> 16 petition, two bills were filed in the North Carolina House of Representatives (House) that <br /> 17 potentially severely impact Orange County's ability to fund school capital needs. <br /> 18 <br /> 19 On March 20, 2017 House Bill 406 was filed in the House. If it passes, House Bill 406, <br /> 20 which specifically targets Orange County, will strip the County of its authority to levy <br /> 21 impact fees. On March 22, 2017 House Bill 436 was filed in the House. House Bill 436 is <br /> 22 similar to House Bill 406 in that it would strip the County of its impact fee levying <br /> 23 authority. Unlike House Bill 406, House Bill 436 targets numerous jurisdictions <br /> 24 throughout the state and eliminates all regulatory fees on new construction unless the <br /> 25 fee is specifically authorized by general law. Should either bill pass Orange County will <br /> 26 lose millions of dollars annually that is used to assist in school capital projects. This will <br /> 27 leave a deficit that ultimately must be filled with a tax increase that requires all property <br /> 28 owners in Orange County to pay for the costs of new development. <br /> 29 <br /> 30 Staff has analyzed the submitted petition and suggests revising the dates in the current <br /> 31 resolution to allow for a longer grandfathering period for projects 90-units or greater in size <br /> 32 rather than adopting the language suggested by the petitioner, which is tailored for a specific <br /> 33 project. Other projects that are currently in various planning phases could potentially take <br /> 34 advantage of the longer grandfathering period if submittal deadlines are met. <br /> 35 Staff shared the staff recommendation with the petitioner. The petitioner provided the following <br /> 36 suggestions: <br /> 37 • Move the staff-recommended Zoning Compliance Permit (ZCP) issuance date of July <br /> 38 31, 2017 out to December 31, 2017; alternatively, require only submission of the ZCP <br /> 39 application by May 15, 2017. <br /> 40 o Staff notes an alternative exists where the ZCP submission is in May and the <br /> 41 issuance is in December. Petitioner's position on this alternative was unclear at the <br /> 42 time of publication. <br /> 43 • Move the Building Permit application date from January 1, 2019 to January 31, 2019. <br /> 44 • Move the fee paid-by date from June 30, 2019 to June 30, 2020 (to be more in-line with <br /> 45 the Certificate of Compliance date of December 31, 2020). In accord with the attached <br /> 46 resolution, the BOCC intends that any additional grandfathering requests for projects <br /> 47 90-units in size or greater must be submitted prior to July 31, 2017. <br /> 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.