Orange County NC Website
45 <br /> Exploring Affordability CRT <br /> �4 <br /> Initial scenario based on assumptions from the Wake Transit Plan: <br /> CRT State Funding 0% <br /> CRT FTANew Starts Share 50% <br /> CRT Project Development and Construction 2018-2026 <br /> Period <br /> CRT Capital Cost Split (D/ W) * 33 .3 / 66.6 <br /> CRT Operating Cost Split (D/ W) 33.3 / 66.6 <br /> * The total project cost and local share for CRT varies slightly between the Durham cash flow and <br /> Wake Transit model, due to differences in capital cost escalation assumptions. These results are <br /> based on the project cost in the Durham cash flow. <br /> 0704 •D • <br />