Browse
Search
Agenda - 04-18-2017 - 5-a - Presentation and Public Hearing on the Draft Orange County Transit Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 04-18-2017 - Regular Mtg.
>
Agenda - 04-18-2017 - 5-a - Presentation and Public Hearing on the Draft Orange County Transit Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 7:38:04 AM
Creation date
4/18/2017 7:22:23 AM
Metadata
Fields
Template:
BOCC
Date
4/18/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 04-18-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> Local Funding <br /> • <br /> More Borrowing Against Anticipated Revenues <br /> Grant Anticipation Notes to manage slower federal funds (repaid by grants) <br /> • Short-term Limited Obligation Bonds during D-O LRT construction <br /> • Long-term TIFIA loan drawn down during D-O LRT construction <br /> D-O LRT Cost-Share Agreement <br /> o Current agreement executed in 2012 - 77.05% Durham / 22.95% for project costs <br /> Extension to North Carolina Central University in Durham <br /> Change from 5 to 4 stations in Orange County through environmental process decision <br /> Orange does not maintain a positive cash flow for Orange County <br /> Re-negotiation of cost-share is ongoing; draft plan assumptions are starting point for <br /> discussion <br /> 82% Durham / 18% Orange for project costs; 80% / 20% for operating and maintenance costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.