Orange County NC Website
u ( ' <br /> • <br /> i V <br /> • <br /> The Planning Staff feels that there is a preponderance of evidence to indicate <br /> substantial compliance with the General Standards and specific rules governing <br /> the Planned- Development-•Office-'institutional, Class A Special Use Permit. The <br /> Planning Staff recommends approval of the request, with the following imposed <br /> conditions: <br /> 1. That- all signs for the development shall be according to Section 7-, 16 <br /> and Article 9 of the Zoning Ordinance. <br /> 2. Drainage, soil erosion and sedimentation plans shall be reviewed and <br /> approved by Orange County. The installation of control devices and <br /> bn going construction work shall. be inspected by Orange County. The <br /> site shall at all times be in conformance with the. Soil Erosion and <br /> Sedimentation Control Oridnance. <br /> 3. That the proposed dumpster- be• placed an a 10' x 20' concrete pad 6" <br /> thick, with wire mesh. <br /> k. That the service entrance from NC-86 to the entrance gate into the storage <br /> yard be paved to Y.C. Department of Transportation Secondary road stan- <br /> dards. <br /> S. Than the- developer mark the 100' buffer an the perimeter of the site and <br /> take precautions to insure that the grading contractor does not disturb <br /> the• area.. <br /> 6. The final site plan and. narrative of the project incorporatias all changes,. <br /> deletions and additions through. the. final approval of the project are in- <br /> corporated herein and made part of the Special Use. Permit.. A copy of the <br /> final site plat and narrative are to be maintained on file. with the Orange <br /> County Planning Department. Only those uses specified. in the project <br /> narrative and on the site plan, including but not necessarily limited <br /> to the offices, warehousing, maintenante. ser'rice and outside storage <br /> of utility- materials will be permitted at the e f i,ce facility. All <br /> improvements as indicated shall be constructed according to the consturc- <br /> rion schedule set forth, in this. permit, <br /> 7, The following construction. schedule shall be adhered to by the applicant. <br /> Construction shall begin within. six months of the issuance of the Special <br /> Use Permit, <br /> 8. All necessary easement to permit utility (electricity, telephone, sewer <br /> and. water) installation, servicing and hookups to the development shall <br /> be provided at no cost to the utility provider. <br /> • <br /> • <br /> • <br />