Browse
Search
2017-133-E Planning - Foster Lake and Pond Management, Inc. for carp fence repairs on Lake Orange
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-133-E Planning - Foster Lake and Pond Management, Inc. for carp fence repairs on Lake Orange
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 11:56:17 AM
Creation date
4/11/2017 2:15:35 PM
Metadata
Fields
Template:
Contract
Date
4/11/2017
Contract Starting Date
4/11/2017
Contract Ending Date
6/30/2017
Contract Document Type
Contract
Amount
$4,880.00
Document Relationships
R 2017-133-E Planning - Foster Lake and Pond Management, Inc. for carp fence repairs on Lake Orange
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„��__'�ment A <br /> DocuSign Envelope ID: 1F025F8B-ABFD-4818-8665-3BD9C14F7E17 <br /> Foster Lake & Pond Management, Inc. )!. <br /> 9020 White Oak Rd. Foste r Lake <br /> Garner, NC 27526 b' Pond Management <br /> Phone: 919-772-8548 <br /> Fax: 919-662-7856 <br /> Email: david @fosterlake.com <br /> Quotation <br /> To: Orange County Planning & Inspections Dept <br /> Attn: Allison Reined <br /> 131 W. Margaret Lane <br /> PO Box 8181 <br /> Hillsborough, NC 27278 <br /> Date Quotation Number Project Name <br /> 03/24/17 LOFBR032417 Lake Orange Fish Barrier Repair <br /> 2017 <br /> Description Total <br /> Location: Lake Orange, Hillsborough, N.C. <br /> Objective: Repair of damaged pads of existing fish barrier <br /> The following services will be performed to accomplish the objective stated above: <br /> • New pipe will be added to sections of barrier at the edges where pipe does not currently <br /> exist (see Figure 1). <br /> • Existing, loose wood brace (see Figure 2)will be re-attached. <br /> • Three cross sections of split wood (see Figure 3a)will be replaced. New 2x6s will be <br /> installed (see Figure 3b). <br /> • One supporting post located in the middle of the barrier that has been come loose (see <br /> Figure 4a)will be repositioned and secured to a newly mounted post (see Figure 4b). <br /> Also, a new wood brace will also be installed. $4,880.00 <br /> • Two detached cross sections (see Figure 5)will be reattached to the post. <br /> • Horizontal braces will be installed onto 11 post joints (See Figure 6). <br /> • New pipe will be added to any spots that have missing pipes. <br /> • New screws will be added to any existing pipes that have come loose due to deteriorated <br /> screws. <br /> Total $4,880.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.