Browse
Search
Agenda - 03-07-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 03-07-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 4:22:44 PM
Creation date
4/11/2017 11:43:37 AM
Metadata
Fields
Template:
BOCC
Date
3/7/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830307
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 026 <br /> Y <br /> T <br /> THE OLD COURTHOUSE PROPOSAL <br /> The Old Courthouse report submitted by Mr. Robert Giles leaves four <br /> alternatives to pursue to alleviate the overcrowded condition of the court <br /> system. Based upon the conditions set forth in this report, staff has looked <br /> at every possi ility and recommended the following recommendation. This <br /> would be to utilize the courtroom of the Old Courthouse for some period of <br /> time until an annex can be constructed onto the present courthouse. We would <br /> realize this w uld be somewhat of a stop-gap measure but one which at present <br /> would be the most economical and cause the least inconvenience to all depart- <br /> ments. <br /> Proposal .A <br /> Proposal provides for the utilization of 1980 square feet of the second <br /> floor of the New Courthouse. This area now houses the County Manager' s Office, <br /> Finance Department, Clerk to the Board of Commissioners and the Board's meeting <br /> room. These olf'ices would have to be re-located in some other space. There is <br /> no other space 'available other than the first floor of the Old Courthouse. The <br /> above mentioned offices and departments cannot fit into that area due to there <br /> being insufficiont room without going to the upper floor and creating some office <br /> space. There would also be some $20,000 to remodel the upper floor to accommo- <br /> date the courtroom, jury room and judges chambers and attorney and client area. <br /> There is also some problem with not being able to enclose the area next to the <br /> bathroom and a possible elevator area. The air conditioned area is on two sys- <br /> tems and this would create some problems for a courtroom. There also is some <br /> problem with having all people clear out of the courtroom. In fact, they would <br /> have to go downstairs since there would not be room enough to congregate in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.