Browse
Search
Agenda - 04-05-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 04-05-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 2:09:34 PM
Creation date
4/11/2017 11:36:31 AM
Metadata
Fields
Template:
BOCC
Date
4/5/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830405
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cat) <br /> CHANGE <br /> Distribution to: <br /> ORDER OWNER p <br /> 0 <br /> AlA DOCUMENT G701 I ARCHITECT <br /> r9`, CONTRACTOR )] <br /> FIELD [ <br /> OTHER <br /> PROIECT: Adolescent Day Treatment Center CHANGE ORDER NUMBER: 0.5 <br /> (name,address) 333 NCHasters Street <br /> Chapel Hill, N. C. INITIATION DATE: <br /> TO (Contractor): March 26, 1983 <br /> C� Triad, Inc. —I ARCHITECT'S PROJECT NO: p,0, #5195 <br /> ! <br /> P.O. Box 1905 <br /> )fur , N. C. 27702 CONTRACT FOR: General Construction <br /> L J CONTRACT DATE: December 14, 1982 <br /> You are directed to make the following changes in this Contract: <br /> Remove existing loading dock and replace with new construction as <br /> outlined in' proposal <br /> Add to Contract Sum for this Change Order G.5 <br /> $1105.00 <br /> Not valid until signed by both they Owner and Architect. <br /> Signature ni the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was ..., <br /> Ni't change by previously authorized Change Orders "„" •.....""'" $ 7b,302.664 4•The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was „•,•• 0,803. <br /> The (Contract Sum) (Guarante�cl Maximum Cost) will be (increased) (sistaaeiftn¢ $O'803"64 <br /> by this Change Order ,•l..: ... • <br /> The new(Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be.••• $ 1,105,00,9 .64 <br /> The Contract Time will be l' R 81,508.6 <br /> �aatic�i�s(unchanged) by <br /> The Date of 5ulystanti.tl Comg e(ion as of the date of this Change Order therefore is ( 0 ) Days. <br /> Nay 25, 1983 <br /> Authorized: <br /> C [tTt C7. I CONTRACTOR <br /> E. Rosettary St P.O. Box_1905 OWNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.