i <br /> t <br /> 031 <br /> i I <br /> CHANGE Distribution to: <br /> ORDER OWNER 0 <br /> MA DOCUMENT C701 CONTRACTOR CONTRACTOR <br /> FIELD 0 <br /> OTHER j:3 <br /> PROJECT. Adolescent Day Treatment Center CHANGE ORDER NUMBER: G.3 <br /> (name,address)' 333 McHal,sters Street <br /> Chapel Hill, N. C. INITIATION DATE: March 18, 1983 <br /> TO (Contractor): <br /> 1"'"" <br /> r ad,P.O. Box Inc.c. <br /> ARCHITECT'S PROJECT NO: P.O. #5195 <br /> ham, N. C. 27702 CONTRACT FOR: General Construction <br /> CONTRACT DATE: December 14, 1982 <br /> You are directed to make t e following changes in this Contract: <br /> Place Order or Finish Hardware shoen on attached, spproved Hardware <br /> Schedule, with S. H. Basnight and Sons, in the sum of <br /> including 47. sales tax $2978.40 <br /> in accordance with Specified Allowance #3 <br /> $2500.00 <br /> Add to Contract Sum this Change Order G.3 <br /> $ 478.40 <br /> Nat valid unlit signed by both the Owner and Architect, <br /> Signature of the Contractur indiceles his agreement herewith, including any adjustment in the Contract Sum or Contract how., <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was .,, <br /> Net change by previously atuIh1rized Change Orders 76,600.00 <br /> S 3,901.24 <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior.to this Change Order was -,,.. • . ..„ $ 80,501.24 <br /> The (Contract Sum) (Guaranteed Maximum Cost) will be (increasedbtt!#tzeorase <br /> by this Change Order ,.. �gzx <br /> The new(Contract Sum) (Guaranteed Maximum $ 478.40 <br /> Cost) including this Change Order will be $ 80,979.64 <br /> The Contract Time will be st sorik3(olerxat�sxdE) (unchanged) by <br /> The Date c, Substantial Completion as Zr( the date of this Change Order therefore is ( 0 ) Days. <br /> May 26, 1953 <br /> James M. Webb, Ate, Triad, Inc. Authorized: <br /> I CT Orange County <br /> -. Rosemary St 3 7RA TOI: ,(]WNER <br /> .�. Box 1905 ranee County r�fl[E Y r fin..n n <br />