Orange County NC Website
t <br /> C28 <br /> CHANGE Distribution to: <br /> ORDER OWNER ❑ <br /> AM DOCUMENT C707 <br /> CONTRACTOR ID <br /> FIELD 0 <br /> OTHER 0 <br /> PROJECT: Adolescent Day Treatment Center CHANGE ORDER NUMBER: <br /> (name,address) 333 Mcilasters• Street G.2 <br /> TO (Contractor): Chapel Hill, N. C. INITIATION DATE: March 18, 1983 <br /> 1--- Triad, Inc. '``�'� ' <br /> ARCHITECT'S PROJECT NO: . <br /> P.O. Box 1905 I .Q. #5195 <br /> Durham, N. C. 27702 CONTRACT FOR: General Construction <br /> L,,,,_ _J CONTRACT DATE: December 14, 1982 <br /> You are directed to make t e following changes in this Contract: <br /> Place Order f:or Toilet Accessories shown on attached approved list, <br /> with S. H. Basnight and Sons, in the sum of $1436.24 <br /> in accordant with Specified Allowance #2 (tax included) , <br /> $1500.00 Lump Sum <br /> Credit to Owner $ 63.76 <br /> Nut valid until signed by both tholOwner and Architect. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract'Finn.. <br /> The original (Contract Sum) (1uaranteed Maximum Cost) was ...................—.. ..... $ 76,600.QQ <br /> Net change by previously authorized Change Orders ...... .....r........... ... $ 3,965.00 <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was ...,. .. , ... $ 80,565.00, <br /> The (Contract Sum) (Guarantee'd Maximum Cost) will be adJ (decreased) Cctsskau <br /> by this Change Order . 63.76 <br /> 1110 new(Contract Sum) (Guarrieed Maximum Cost) including This Change Order will be ... $ 80,501.24 <br /> The Contract Time will be at5mlbides tDp ogrk (unchanged) by <br /> The Date of Substantial Completion as of the date of this Change Order therefore is 1 0 ) Days, <br /> May 26, 1983 <br /> Authorized: <br /> James M. Webb AIA Triads Inc. Orange Count <br /> ARCHITECT Rosemary St CONTRACTOR OWNER County <br /> A.t.t1 p�Q.. $ox 1905 Orange County 1`Artrthrs,, <br />