Orange County NC Website
i <br /> oHANCE coon <br /> 024 <br /> BOARD Or CWIMISSIONEES Action Agenda <br /> ACTION AGENDA ITEM ABSTRACT Item N . E•` <br /> MEETING I''I DATE April ;, 1983 <br /> Subject: Adolescent Day Treatment Center Change Orders <br /> re�tL ' ---�"" 1 Public Hearing: ' yes X no] <br /> 1 <br /> Attachment s . Information Contact: " <br /> Yes County Manager's Office <br /> .-_........._..... Phone Number: 732-8181 ext. 501 <br /> PU' E: To consi er adjustments to the contract of the General Contractor. <br /> NEED: Five chan es are requested by the Architect in order to: <br /> Change Or e � <br /> 9 er Number <br /> G. 1 This is to construct a storage area in the boiler <br /> room that is fire proof to house the compressor <br /> and store other items. Add $3,965.00 <br /> G.2 Allowance in contract for toilet accessories was <br /> $1 ,500. Bid came in at $1,436.24 so there is a <br /> credit to the contract. Delete 63.76 <br /> G.3 Allowance in contract for hardware was $2,500 <br /> under the General Contract, Bid came in at <br /> $2,978.40 so there is a need to increase the <br /> contract. Add 478.40 <br /> 0.4 Allowance in contract for metal lockers was <br /> $800. Bid came in at $624.00. Delete 176.00 <br /> 0.5 This is to replace the existing deteriorated <br /> loading dock and with new construction that <br /> would have proper footings. Add 1 ,105.00 <br /> IMPACT: Contract wlith General Contractor is $76,600. Approval of the 5 change orders <br /> would add a net amount of $5,308.65 to the contract. Since the bids came in <br /> under budg' t,funds are available without a budget amendment. <br /> 1 <br />