Orange County NC Website
C `:,G^ CC'UN"iy' Goe7 <br /> E.D_fl_D O" CC:3•I.ISS I C_NF S <br /> Iteot o_ I• <br /> Acrio. ; E•D rr [ ABSTf�AC'L <br /> NESTING D1TE April 5, 1983 <br /> Subject: Wildwood Section One Subdivision <br /> --- b i c Accra ring- yes v n: <br /> Dpa. : Planning <br /> Attscha,._nt(s) : Checklist ifnrmwt an C: nthct: Marvin Collins <br /> Tax Map 732-8181 EXT. 349 <br /> Plan phone �: <br /> PUMME: To consider approval of the Preliminary Plan for Wildwood Section <br /> One. <br /> N®: Property is located in Hillsborough Township on N.C. 86. There <br /> are 26 lots proposed out of 9.93 acres. The proposed roads are <br /> to be constructed to State standards. The lot sizes meet the <br /> minimum requirement for an RT-4 zone. The tract is located in <br /> the Orange Rural Fire District. <br /> IMPACT: The proposal meets the existing standards for lot size and access. <br /> Lots within. the subdivision average 0.23 acres or 10,018.80 sq. <br /> ft. in size. 10,000 sq. ft. minimum lot areas are required. <br /> Streets within the subdivision are to be constructed to N.C. DOT <br /> standards with lot access limited to interior streets. The area <br /> is designated as 10 Year Transition by the Land Use Plan. . Develop- <br /> ment permitted densities of four (4) units per acre in this <br /> location will have minimum impacts on the area provided certain <br /> improvements and other. conditions are met. <br /> Completion of the initial phase of 26 lots will result in traffic <br /> volume of 253 trips per day. This is based on an average trip <br /> rate of 9.72 trips per day for medium density single family <br /> dwellings. <br /> When this project is complete, additional 35.0 acres of land <br /> would be developed for single-family purposes at R-5 densities <br /> (7,500 sq. ft./lot) , while 29.7 acres would be uitlized, for <br /> condominuin development at R-8 densities (Sunits/acre) . The <br /> proposed R--S development would generate approximately 1,620 <br /> • trips per day. This is based on subtracting 18% of the total <br /> acreage (6.3) for street right-of-way and dividing the remain- <br /> ing acreage (28.70) by 7,500 sq. ft./lot, and applying the <br /> trip generation factor of 9.72 trips/single family dwelling. <br /> The proposed R-8 development would generate approximately 1,180 <br /> trips per day. This is basa'9 on multiplying the acreage (29.7) <br /> times .8 'units/acre and applying a trip generation factor of 4. 97 <br /> trips/condiminium. <br /> The net effect of the total development would be to generate <br /> an estimated 3,053 trips/day. Since the capacity of NC Highway <br /> 86 is 9,500 vehicle/day, the development would push existing., <br /> traffic volumes, (4,100 ADT) on NC 86 to near capacity levels <br /> within the developer's five (5) year time' frame for development <br /> of the project. <br /> The impact of these traffic volumes should warrant improvements <br /> to NC Highway 86 to handle increased traffic and turning move- <br /> ments. The subdivisio Regulations allow the r3oard of Commissioner <br />