Orange County NC Website
' ��•. 'fig•^:^ �'« -',:-.:.-,-;:,-":',i''',-,^"t.�' :tt_ :'i:7Ya..i,'�!.• F ':?� '.}^r`,'�r:' :` :1 ;:;k=��'r,!��.°�Ta:F:�c.��_:!.��3,• <br /> ql •,,*':,":' <br /> ;y,,.'r":'S _�wir « Yt�t 1`''iYlijr •:- .� !�• - '+ '� <br /> 014, : : <br /> ', "1.':.14.,f ."; ::,''.. 5+� " <br /> $. € .J _ _%': ' ::: it <br /> '�J ,- <br /> a ,: is '7 i <br /> 10 <br /> other stationed in the T-hanger area of each phase; (6) a contribution <br /> to Fir Company in an amount not to exceed $10,000 to enable Fire <br /> Company to purchase a water pump to be mounted either on a Fire <br /> Company trailer or truck. This amount is payable on demand upon the <br /> issuance to applicant of any building permits; (7) the following safety <br /> features must be adhered-to by applicant: (a) the T--hangers must <br /> contaii no open-flame heaters; (b) no loading or unloading or storage <br /> of fuel shall be permitted in any hanger area; (c) the requirements of -- <br /> (a) an0 (b) shall be prominently displayed in all hanger areas and <br /> incorporated into an Airport Operating Manual which manual shall be <br /> made lavailable to all airport users; (d) all FAA safety requirements <br /> pertaining to construction and operation of a public airport the size of <br /> Midway shall be adhered to; (8) a communication system between the <br /> Midway F.B.O. control room and Fire Company shall be installed by <br /> applicant. <br /> 1 <br /> 1 5. The following construction schedule shall be adhered-to <br /> by they applicant: Construction of the runway shall begin within one <br /> year of final approval of the Special Use Permit and all construction <br /> on thel runway shall be completed one year after construction begins. <br /> All construction detailed in phase one of the site plan and project <br /> narratilre will be completed ninety (90) days after completion of the <br /> runway Phase two will be initiated within six months after the start <br /> of construction of phase one and be completed within two years of <br /> initia ion. Phase three will be completed within two years of <br /> comple on of phase two. <br /> 6. The grantee of this Special Use Permit shall post with <br /> Orange' County, in a form acceptable to the County Attorney, a bond <br /> or letter of credit in an amount equal to the cost of construction of <br /> all public Improvements, including, but not limited to, grading, clearing <br /> and stabilization of all areas in public streets and the erection of <br /> street signs, fire ponds and fire fighting equipment, plus 10%. The <br /> amount1 shall, be determined on the basis of fully executed construction <br /> contracts or certification by a registered engineer employed by the <br /> grantee of this Speical Use Permit. Security for construction of the <br /> improv m ants in this project may be released according to the phasing <br /> in the 1projeet. Specifically, as improvements are completed in each <br /> phase, ithat phase and a corresponding amount of money may be <br /> released from the security instruments or the security instruments may <br /> be renegotiated based on the unconstructed portion of the <br /> improv rnents. , <br /> 7.. Flight training operations shall not exceed 50% of the <br /> total operations for the facility. <br /> I <br /> 8. All necessary easements to permit utility (electricity, <br /> telephon1 e, sewer and water) installation, servicing and hookups to the <br /> development shall be provided at no cost to thw tiiiiit., ,,..,-1,-1„- <br />