Orange County NC Website
I Paul Thames - Re' Orange County - Buckhorn Project Page 2 <br />Design Management Unit <br />Construction Grants & Loans Section <br />Paul Thames wrote: <br />Cecil, <br />I am copying (attaching) you a letter that I sent to Bobby Blowe on <br />Friday, seeking clarification on issues that touch on your review as <br />well as the overall picture for this project. Perhaps Bobby has shared <br />this and his response(s) with you already. Bobby's responses did not <br />fully confirm all of those issues I was trying to nail down, instead <br />generally referencing the ongoing dialogue with you and Seth on behalf <br />of CGLS, Jim Thames and myself on the part of Orange County and Robert <br />Wilson and Darrell Russell behalf of Mebane. <br />I would appreciate it if you would look at the attached letter, <br />particularly the portions (page 2) related to your review -specifically <br />what you are expecting to receive from Mebane and Orange County in terms <br />of documentation and when you will be authorizing Orange County to <br />proceed with the portion of the project not involving the actual <br />construction work that improves the capacity of Mebane's infrastructure. <br />I also want to point out that Mebane - at least according to my last <br />conversation with Mebane -now proposes to replace the existing 120D If <br />of 8" gravity line with 12" line as opposed to extending the 8" force <br />main to the existing end of the 12" gravity line. <br />In any event, please review the letter and advise as soon as possible <br />if my understanding as to what is required and the sequence of events is <br />or is not accurate. Thank you for you assistance. <br />Paul <br />Paul K Thames, PE <br />