Browse
Search
Agenda - 02-21-2006-10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-21-2006
>
Agenda - 02-21-2006-10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:48:33 AM
Creation date
8/29/2008 9:06:32 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2006
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 20060221
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />The Board has asked if its STAG funding is in danger of being reduced or otherwise <br />negatively impacted by reconfiguring the overall Buckhorn Road EDD/Community <br />and Central Efland project withdrawing the portion of the project intended to serve <br />Gravelly Hill Middle School from the grant funding process. <br />CGLS Chief Bobby Blowe has responded -via email -the CGLS has no problem with the <br />Gravelly Hill portion of the project being broken out and that this does not endanger the <br />funding in any way.. Mr. Blowe has also indicated that the EPA has no knowledge as to the <br />original configuration of the STAG project and consequently has now and will have no <br />concern as to any project reconfiguration, <br />The Board has asked if Mebane's proposal to modify its existing infrastructure <br />(redirecting the discharge from one pumping station and increasing the line <br />size/capacity of a 1200 foot section of its gravity sewer) is going to satisfy CGLS <br />requirements as to the capacity of Mebane's infrastructure. <br />CGLS staff has provided email correspondence indicating that Mebane's proposal appear <br />to be satisfactory in principal and theory, but that final approval depends on Mebane being <br />able to show by engineering calculation and hydraulic modeling (computer simulation <br />modeling) that the proposal should actually work, Mebane's consulting engineer has <br />indicated today that he expects to complete the process of developing engineering <br />calculations and hydraulic modeling and submitting the documentation to CGLS for CGLS <br />staff review by Thursday, February 23`d. We anticipate the CGLS staff will complete its <br />review of this material early in the week of February 27th. <br />If I may provide additional information or clarification of the information included herein at <br />this time, please advise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.