Orange County NC Website
8 44 <br /> 1 6 i <br /> 'Page 2 <br /> long range planning considerations, since an assumption could be made that some <br /> propes in the area may already be viewed as transitional in use when compared <br /> to rising land values generated by these very factors. <br /> In conclusion, one might validly assume that the development PEMC is proposing <br /> has in it the ability to serve as an anchor for a high quality office, institu- <br /> tional, and industrial complex that could become the pride of the commuaity,_ <br /> Job opportunities as well as an increased tax base for the entire county of <br /> Orange can readily be realized from this <br />