Orange County NC Website
T <br /> northern property line at NC 86. The site plan indicated that a good amount <br /> of the existin; vegetation should remain, there will be considerable clearing <br /> and grading iri,olved in the construction of the proposed outdoor storage areas. <br /> The building does not exceed the maximum allowed floor areas, or he <br /> Nor does it exceed the macimum allowed intensity of deve heights. <br /> development. The signs, <br /> used to identify the project and give directions within the project shall meet <br /> all sections o` Article 9. <br /> If the application for rezoning is approved and the application for the <br /> Special Use P 't granted, the Planning Staff suggests the following conditions . <br /> be attached to the Special. Use Permit. <br /> 1. That all signs for the development shall be according to Section 7. 16 <br /> and Article 9 of the Zoning Ordinance. <br /> 2. Drainage, soil erosion and sedimentation plans shall be reviewed and <br /> approved by Orange County. The installation of control devices and <br /> bn going construction work shall be inspected by Orange County. The <br /> site shall at all times be in conformance with the Soil Erosion and <br /> Sedimentation Control Oridnance. <br /> 3. That the proposed dumpster be placed on a 10' x 20' concrete pad 6" <br /> thick, with wire mesh. <br /> 4. That the service entrance from NC-86 to the entrance gate into the storage <br /> yard be aved to N.C. Department of Transportation Secondary road stan- <br /> dards. <br /> 5. That the developer mark the 100' buffer on the perimeter of the site and <br /> take pre autions to insure that the grading contractor does not disturb <br /> the area <br /> 6. The final site plan g approval of the project changes,' <br /> are in- <br /> es <br /> and narrative of the project incorporating all chap <br /> deletions and additions through the final a ' (, <br /> corporated herein and made part of the Special Use Permit. A. copy of the <br /> t final sie plan and narrative are to be maintained on file with the Orange <br /> County Panning Department. Only those uses specified in the project <br /> narrative and on the site plan, including but not necessarily limited <br /> to the offices, warehousing, maintenance service and outside storage <br /> of utility materials will be permitted at the office facility. All <br /> improvements as indicated shall be constructed according to the consturc- <br /> Lion sc �edule set forth in this P ermit <br /> 7. The fol owing construction schedule shall be adhered to by the applicant. <br /> Construction shall begin within six months of the issuance of the Special - <br /> Use Permit. <br /> 8. All necessary easement5to permit utility (electricity, telephone, sewer <br /> and watr) installation, servicing and hookups to the development shall <br /> be provided at no cost to the utility provider. <br />