Orange County NC Website
796 <br /> 113 <br /> - ° <br /> ` ^ <br /> - _ <br /> - .. - <br /> SECURITY BUILDING COMPANY,INC. <br /> November 5, 1982 <br /> p� Box 967 C»ope Hill NC 27514 ��ov°v)�9�o� " <br /> Joseph L. N"ss|f, A|A <br /> P. V. Box 2615 <br /> Chapel Hill , N. C. 27514 <br /> Re: Orange County Jail Facility <br /> Hillsborough, N. C. <br /> Dear Joe, <br /> In accordance with our discussion at the job site on Friday, <br /> October 15, 1981 and as described in my letter dated October 25, 1982 <br /> (attached), we submit our proposal to remove the plaster finish in <br /> rooms 139 and 141 and to install one heavy coat of silicone for the <br /> lump sum of $1,330.00. <br /> Listed below is a breakdown of this proposal: <br /> Remove plaster and sandblast brick: $ 1,300.00 <br /> Install Silicone finish: 250,00 <br /> Delete plaster patching: ( 200.00) <br /> Delete painting at existing brick w"|/s, ( 141.00) <br /> Sub-total $ 1,209.00 <br /> lu% Profit 6 Overhead 121J0 <br /> Total Amount of This Proposal $ 1,330,00 <br /> We trust the above is in order and a change order can be issued to <br /> our contract to cover this cost. We do need to proceed with the removal <br /> of the plaster and sandblasting the finishes prior to the installation <br /> of the hardware and operators of the jail equipment. Therefore, it is <br /> essential that we get approval for the above as soon as possible. If you <br /> need any additional information concerning the above, please feel free <br /> to contact me. <br /> Yours truly, <br /> \ <br /> Ward L. Setzer <br /> Vice President <br /> Manager, Commercial D|v, <br /> wLS/h]h <br /> cc: Mr. Bill Laws <br /> __-_-_ - _ -_ <br />