Browse
Search
Agenda - 10-25-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 10-25-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 2:22:11 PM
Creation date
4/4/2017 2:00:43 PM
Metadata
Fields
Template:
BOCC
Date
10/25/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19821025
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c ) signed statement from the municipality, private <br /> corporation or sewer and water authority to whose <br /> system the requested utilities will be connected <br /> stating their willingness to serve the proposed <br /> project as well as any other existing or antici- <br /> pated development in the area specified by the <br /> County. The statement should also attest to <br /> their capabilities for meeting all the required <br /> needs of utility services to the project including <br /> foreseeable expansions as well as other existing <br /> and potential development specified by the County <br /> in the area of the project . <br /> SECTION III: SELECTION CRITERIA <br /> COMMENT: Thissection sets forth the general criteria that will be <br /> usedlin determining the suitability of a proposed project <br /> for funding. <br /> It shall be the policy of Orange County to fund major water and <br /> sewer utilities to a reasonable point along the property line of an <br /> approved project , within the limitations of available funds . Major <br /> sewer and water extensions are defined as projects outside of existing <br /> service areas where pipe sizes greater than eight inches in diameter <br /> are extended more than 750 feet beyond existing fa,bilities . In select <br /> ing projects to be funded, the following criteria will be used. Any <br /> proposed project must : <br /> a) be in conformance with the Orange County Land <br /> Use Plan; <br /> b) be outside of a protected watershed or where <br /> proposed to be within a protected watershed, <br /> be able to show the proposed development is <br /> compatible with maintaining water quality, <br /> c) have the proper zoning at the proposed site- <br /> d) improve job opportunities available to Orange <br /> County citizens and especially for women and <br /> minorities by <br /> (1) having non-discriminatory personnel employ- <br /> ment policies; <br /> ( ) having affirmative action plans to increase <br /> the number of women and minorities in non- <br /> traditional ,jobs; <br /> (3) provide child care services for workers . <br /> e) provide jobs above the prevailing wage scale <br /> in the County; <br /> f) not place an inordinate demand on County services <br /> such as schools, .fire and police protection, <br />
The URL can be used to link to this page
Your browser does not support the video tag.