Orange County NC Website
CURRENT !NEEDS LONG-RANGE NEEDS <br /> }HIGH SCHOOL <br /> High School Guidance Area Renovation $ 87,000 <br /> and Biology Classroom Renovation <br /> Bleachers -for Baseball Field and 12,000 <br /> vistors side of Football Field <br /> Floor Treatment $20,000 20,000 <br /> Tile hallways "A" Building, the and <br /> carpet Cultural Arts Building (foyer), <br /> Carpet Library <br /> Cafeteria Additions 225,000 <br /> Approx 2,500 sq. ft. <br /> Site Development at High School 695,000 <br /> includes soccer field. (Joint use <br /> with Elizabeth Seawell ) , paving rear <br /> lots, numerous sidewalks, and land- <br /> scaping. (Brief study in 1974) <br /> Roofing Project "8" building $80,000 <br /> Energy Conservation, converting from $60,000 <br /> _Electric Heating & Air-Conditioni_n.g <br /> to use of existing hot water bailer -- — <br /> & chiller <br /> Furniture and Equipment Replacement $50,000 <br /> to get back on a replacement cycle <br /> (complete High School )- <br /> Technology in the Classroom 90,000 <br /> Computers for the High School <br />