ti 4
<br /> . .
<br /> . . . - . .
<br /> _ . ':.:•--:i'.:76-r.-...`.:.;:t7-',,T'..:" :
<br /> . . ,
<br /> . .
<br /> ' .
<br /> . ,
<br /> . . ...
<br /> .:,... .
<br /> 7. Grading on the site shall be. kept to a minimum. In liew. ofpianted
<br /> - ,
<br /> 4ndscaping, existing vegetation shall be maintained between units.' : ..V.'.:•;, - :
<br /> . . . : 77.-.:.k:3-4 ,-;:..1 ;,-'.,•':,
<br /> 8, Al].. plans for drainage, soil erosion and sedimentation controlsh „t(
<br /> be reviewed and approved by Orange County. In addition, Orange Countw2Shall
<br /> inspect the installation of control devices and the on going work fc&,..tgey. m.i.!
<br /> total project: The project shall at all times meet the requirements: the:-4.„
<br /> Orange County Soil Erosion and Sedimentation Control Ordinance.
<br /> , •• • .,..=:•-•--,:----:p„,.
<br /> 9. Mailboxes should be provided close to the entrance, but fax enough
<br /> into the Mobile Home Park to prevent traffic problems on Mt. Hermon Church:
<br /> Road. A pulloff should be provided and the mailboxes set back off%theLLMain
<br /> entrance road. The entrance road and pulloff should be of sufficient width
<br /> to allow three or four cars to stop and get mail while others continue "to-77-7
<br /> pass. The mailboxes should not be located in a place,that would require
<br /> cars to cross traffic, make unnatural turns or go against the flow of traffic.
<br /> . :. .!-: . , :;.: .-. ...., :.-:•-.: -..,.::.,-
<br /> , . .
<br /> 10. All mobile homes must be at least 100 feet from each well. site-
<br /> • , . , _ .
<br /> 11, The office area should be designated concerning it's use to insurer.
<br /> compliance with the zoning...-district. . • . .....-. ..,,:,
<br /> -' - • --;:',:•••:-..:--.•-
<br /> . •-•: 7-I.,7,;.:.7 . .
<br /> •_-_,12. All!units shall not be closer than 35' to the roads, 40' center,ta
<br /> cente.-. 20. eiito end..: ::: .
<br /> . . :,,....!•:,.. • , -
<br /> .., . . . .
<br /> :11r-',- - .13. There shall be at least 2 parking spaces per mobile home unit ir: '
<br /> avelopment-
<br /> -,-..„." . .
<br /> . ,
<br /> 14. The roads in the mobile home park should be hard surfaced.
<br /> . .
<br /> 15. All roads will be named and the names not duplicate any other names
<br /> within Orange County. Road name signs to Orange County standards shall be
<br /> _erected_at_all intersections- Individual units shall be numbered in such a
<br /> manner that the identification is visible from the road. . .
<br /> • .
<br /> 16. Removal of snow and ice• from the roads in the development and the
<br /> sidewalks within the development shall be the responsibility of the grantee-
<br /> Such removal shall be completed promptly.
<br /> 17. There should be more access points to the recreation areas in .
<br /> Phases 2 and 3. Phase 2 has two access pedestrian walkways. This may be
<br /> enough, however, one more could be provided. Phase 3 has only one pedestrian
<br /> walkway; thereJshaUld be at least one more provided and possibly two. ..,
<br /> ,..-
<br /> 18. For pedestrian safety. there should be a central walkway four feet
<br /> wide from the back of the office through the cehter of each block connecting
<br /> the recreation areas and connecting the front and back of the mobile home
<br /> park.
<br /> 19. The private waste water treatment plant should be included as pa :
<br /> 7-- f the Planned Development with access from Mr. Hermon Church Road.
<br /> trt. .
<br /> ,...,.
<br /> 20. Prior to the start of any construction that the State Health
<br /> Department approve the final plans for the water distribution system and
<br /> that the Division of Enfironmental Management approve the final plans or
<br /> ' .: ,,.-::;::.. .,•• . -
<br /> — ' •;-,,-%"-,-. -;.. -., • .7-7,-.
<br /> .. ---....,.._, - - • • ..- .' .. •:. ' • *:.' ''''7".`:**-7776,"J.:'-:-: ... . -,-,:-.-:7••`.:-. :.:,
<br /> . „
<br /> _ .
<br /> _ . .
<br /> . . .
<br /> . .
<br /> . .. • • ,. .
<br /> . .
<br /> . . . • •.;
<br /> . .
<br /> , .
<br /> _-
<br />
|