Orange County NC Website
,S6t•-•1 <br /> ." .. • <br /> 11.1 Identify the type of sewage disposal facilities appropriate . <br /> for an area as a function of the magnitude of present and <br /> future demand T the distribution of users; and the capacity <br /> • .- <br /> of the natural environment to absorb the impact. <br /> 11.2 Identify service by centralized water and sewer systems <br /> (Towns of Hillsborough and Mebane, Orange-Alamance Water <br /> Systems Incorporated and Orange Water and Sewer Authority) <br /> as most appropriate at the higher-density levels which. occur <br /> • <br /> in the Urban and Transition Areas. <br /> 11.6 Allow ground absorption sewage disposal systems of 300 gallmae . • , <br /> per day or more design capacity and package sewage treatment -• <br /> plants with a design capacity of 3000 gallons per day or • <br /> less as appropriate only in the areas designated. Ten and Twenty, <br /> Year Transition and Rural,-.7.1te-S-rdential. <br /> • <br /> This proposal for a PD-H„ R-4 in Eno <br /> the Twenty Year Transition Area is compatible with the poliCies <br /> : both stated andA.mplied in the Land Use Plan. It is consis- <br /> tent with a major theme of the Plan which is to promote <br /> residential development in the County at appropriate locations, <br /> in appropriate densities and at affordable costs to meet the <br /> needs and demands of Orange County Citizens and to make best <br /> use of existing .and proposed public investments in roads and <br /> • <br /> "services.. <br /> --- Ordinance requires: Findings: <br /> ; • <br /> 8.2.4 In. addition to the General <br /> Standards stated in 8.2 the following _ <br /> Specific Standards shall be addressed <br /> by the applicant before the issuance <br /> of a Special Use Permit: <br /> • • <br /> a) Method and adequacy of pro- a) Thera is a central sewage <br /> vision for sewage disposal disposal system with a Package <br /> facilities, solid waste, and Treatment Plant proposed for th.: <br /> water. site. North Carolina Department <br /> of Environmental Management has <br /> issued the final permit for thiz <br /> system.. There is a central watE <br /> system proposed which will be <br /> _ serviced by 2 wells drilled on <br /> -the site. Solid waste disposal <br /> will be handled on a contract <br /> • <br /> basis with a private contractor, <br /> I. <br /> • <br /> • <br />