Browse
Search
Agenda - 08-23-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 08-23-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 4:17:27 PM
Creation date
4/3/2017 4:09:26 PM
Metadata
Fields
Template:
BOCC
Date
8/23/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820823
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.7E <br /> The Planning Staff finds that are is a perp-Dndere.nce of eVidence.to <br /> indicate sUbstantial compliance with the General Standards and specific' <br /> rules governing the request by Buck Yountain Development Co. for a Class <br /> A Special Use Permit under Srotion 8.8.0 of the Orange County Zoning Ord- <br /> inance. The Planning Staff recomv-unds approval of the Special Use Permit <br /> with the folldwing imposed conditions: <br /> 1, That the final site plan and narrative of the project <br /> incorporating all changes, deletions and additions <br /> through the final approval of the project are in <br /> corporated herein and made a part of the Special Use <br /> Permit. That'a copy of the final site plan and narrative <br /> be on file with the Orange County Planning Departnent. All <br /> improvements as indicated on the site plan or stated in the <br /> narrative shall be constructed according to the construction <br /> schedule, set up on the final site plan. <br /> 2. That the grantee of this Special Use Permit shall, post with <br /> Orange County, in a form acceprPhie to the County Attorney, <br /> a band or letter of credit in an amount equal to the cost <br /> of all public iscip=rve;. ots plus 10%. The amount shall be <br /> determined on the basis of fully executed construction contracts <br /> or certification by a registered engineer employed by the <br /> grantee of this Special Use Permit. Security for construction <br /> of the improvements in this project may follow the phasing in <br /> the project. Specifically, as improvements are cu,tleted in <br /> each phase, that phase and a corresponding am-aunt of money may <br /> be released from the security instronents or the security ins- <br /> truments may be renegotiated based on the unconstructed portion <br /> of the improvements, <br /> 3... That security shall be provided for the grading, clearing, <br /> paving and stabilization of all areas in public streets and <br /> the erection of street signs. <br /> 4. That all necessary easements to permit utility (electricity, <br /> telephone, sewer and water) installation, servicing and hookups <br /> to the development shall be provided at no cost to the utility <br /> provider, <br /> 5. All plans for drainage, soil erosion and sedimentation control <br /> shall he reviewed and approved bv Orange County. In addition, <br /> Orange County shall inspect the installation of control devices and <br /> the on going work for the total project. The project shall at <br /> all tires meet the requirements of the Orange C runty Soil Erosion <br /> and Sedimentation Control Ordinance. <br /> 6. That dense evergreen screening be provider] for any buildings that <br /> are not at least 500 from the property line. This screen material <br /> shall b-. of suilficient size to provide a 6' hedge within 3 years of <br /> plantiv, . Also acceptable as a screening material is a 6' birm <br /> or solid wood fence. <br /> 13 <br /> . . _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.