Browse
Search
Agenda - 08-23-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 08-23-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 4:17:27 PM
Creation date
4/3/2017 4:09:26 PM
Metadata
Fields
Template:
BOCC
Date
8/23/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820823
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tv 4- <br /> 780 <br /> Pg.21 <br /> ha sewage collection and disposal system, <br /> 21. That the project remain in unitary ownership and that no lots be <br /> sold t individuals. <br /> 22. A final boundary survey of the Planned Development and improvements <br /> shall be recorded by the developer. <br /> 23. The final site Oar' and narrative of the project incorporating <br /> all changes , deletions and additions through the final, approval of the project <br /> are incorporated herein and made a part of this Planned Development Special <br /> Use Permit. A copy of the final site plan and narrative are on file with <br /> the Orange County Planning Department. Building permits, upon application , <br /> will be ssued for Phase 1 after approval and recordation of the spec al Use <br /> Permit. After Phase 1, all improvements in each phase must be compluted beforc <br /> building permits will be issued for the next phase. <br /> 24 . The development shall be built and run according to the sit. plan <br /> and written narrative supplied by the developer, and in compliance with the <br /> above conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.