Orange County NC Website
43E <br /> Pg.1 <br /> 11, 1 Identify the type of sewage disposal facilities appropriate <br /> for an area as a function of the magnitude of present and <br /> future demand; the distribution of users; and the capacity <br /> of the natural environment to absorb the impact, <br /> 11,2 Identify service by centralized water and sewer systems <br /> (Towns of Hillsborough and Mebane , Orange-Alamancc Water <br /> Systems Incorporated and Orange Water and Sewer Authority) <br /> as most appropriate at the higher-density levels which occur <br /> in the Urban and Transition Areas. <br /> 11.6 Allow ground absorption sewage disposal systems of 300 gallons <br /> per day or more design capacity and package sewage treatment <br /> plants with a design capacity of 3000 gallons per day or <br /> less as appropriate only in the areas designated Ten and Twenty <br /> Year Transition and Rural "Residential. <br /> This proposal for a PD-H, R-4 in Eno Township contd.glmus -te - <br /> the Twenty Year Transition Area is compatible with the policies <br /> both stated and implied in the Land Use Plan. It is consis- <br /> tent with a major theme of the Plan which is to promote <br /> residential development in the County at apl,ropriate locations, <br /> in appropriate densities and at affordable costs to meet the <br /> needs and demands of Orange County Citizens and to mike best <br /> use of existing and proposed public investments in roads and <br /> services, <br /> Ordinance requires: Findings : <br /> 0.2.4 In addition to the General <br /> Standards stated in 8.2 the following <br /> Specific Standards shall be addressed <br /> by the applicant before the issuance <br /> of a Special Use Permit: <br /> a) Method and adequacy of pro- a) There is a central sewage <br /> Vision for sewage disposal disposal system with a Package <br /> facilities, solid waste, and Treatment Plant proposed for thi <br /> water. site. North Carolina Department <br /> of Environmental Management has <br /> issued the final permit for this <br /> system. There is a central vats <br /> system proposed which will be <br /> serviced by 2 wells drilled on <br /> the site. Solid waste disposal <br /> will be handled on a contract <br /> basis with a private contractor. <br /> If <br />