Orange County NC Website
345'/ .,�' <br /> ORANGE COUNTY <br /> soanoor COMMISSIONEFS Action Agenda <br /> ACTION nsFn1Dx ITEM xBSTRACr Item mn, <br /> _--_ <br /> rIE/umc DATE August r' 19n? <br /> Subject: Jail Facility - Change Order Number 2 <br /> | Public Bearing: yes <br /> attacmne`t s : Information Contact: <br /> Yes Kenneth K. Thompson <br /> Phone Number: 7J2-8l8l ext' 501 <br /> �z: <br /> PompCGE, To consider approving work not covered under the original construction <br /> contract. <br /> NEED: Memo to you dated July 23, 1982, outlined the uncovering of soil benea^ <br /> the base of the jail floor that was uncompacted and damp from water le., yge. <br /> This must be removed and replaced with rock or horizontal steel and concrete <br /> bridging system must be constructed. It has been determined that the former <br /> would be less costly and still provide the necessary support for the concrete <br /> floor. Huwever, since dirt removal other than for footings was not covered <br /> by the contract, a modification in the form of a change order is needed <br /> before the work can proceed. <br /> -_- <br /> INTACT: Cost will be $5,700.00 as outlined in the Contractor's amended July 30, <br /> 1982 letter. The architect agrees with the amount, Since there is not a <br /> contingency account for the project payment S5,700 of the amount will come <br /> from interest accumulation within the capital projects fund or adjustment <br /> to the capital projects list for 1982-83. <br /> RECOMMENDATION(S): <br /> App,,/o Change Order Numbe:r 2. <br />