Browse
Search
Agenda - 08-02-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 08-02-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:53:16 PM
Creation date
4/3/2017 3:30:24 PM
Metadata
Fields
Template:
BOCC
Date
8/2/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820802
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> »,5.1 <br /> Page 2 <br /> Joseph L. Nassif, ALA <br /> July 30, 1982 <br /> ]. Labor to operate bobcat with backhoe: $ 56'00 <br /> 4. Equipment to remove material that is excavated <br /> from footing: 92.00 <br /> 5. Labor to operate equipment to remove material that <br /> is excavated from footing: 69.00 <br /> 6. Equipment to install wash stone in the building <br /> including con,oypr, bobcat, loader and tamps: 500.00 <br /> 7. Labor to install wash stone in the building: 600,00 <br /> O. Wash stone delivered to project, <br /> 175 CY (250 tons) @ $8.00/ton: 2'000.00 ' <br /> 9. General Conditions (supervision, etc.): - <br /> 10, H. C. Sales Tax: 100.00 <br /> 11. Labor Overhead: 310.00 / <br /> Sub-total $5,68z.00 <br /> ln% Profit s Overhead . 568.00 <br /> Total $6,250,00 <br /> 6'7^o'*" <br /> The soils engineer with Froehling & Robertson, Inc. recommended that <br /> concrete abutments be installed at the southeast corner of the existing jail <br /> building. If the County elects not to install the concrete abutments, <br /> Security Building Company will make an effort to protect the structure <br /> including the installation of temporary bracing or fill material against <br /> the building. But, Security Building Company can not assume the responsibility <br /> for any damage that is not due to negligence of Security Building Company <br /> or our subcontractors. <br /> Please note that all work on this project has been stopped since <br /> July 16, 1982. There are some fixed costs such as general conditions <br /> (supervision, etc) which are incurred even when no productive work is under- <br /> : way. As soon as a change order is approved, work will get undcrway. We <br /> trust that a decision can be made promptly to prevent any additional delay <br /> and cost to this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.