Browse
Search
Agenda - 08-02-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 08-02-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:53:16 PM
Creation date
4/3/2017 3:30:24 PM
Metadata
Fields
Template:
BOCC
Date
8/2/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820802
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. - <br /> ���� <br /> ~". <br /> . ^ <br /> SECURITY BUftOING COMPANY, INC. <br /> P.O Box 967/Chapel Hill NC 275iu/(Area p19)92v'0au6 July 30, 1982 <br /> Joseph L. Nassif, x|A <br /> P. O. Box 2615 <br /> Chapel xi | i, N. C. 27514 <br /> Re: Orange County Jail Facility <br /> ' Hillsborough, N. C. <br /> Dear Joe, <br /> In accordance with the sub-surface exploration as prepared by <br /> Froehling x Robertson, inc. and your instructions, we offer our proposal <br /> to remove approximately 3' of soil under the proposed slab, remove the <br /> soil that was excavated for the footing (cost of excavation for footing <br /> is not included in this proposal), fill the excavation with a wash stone <br /> under the supervision of the testing laboratory for the lump sum of <br /> $6,250.00. <br /> The sequence of the excavation and backfilling is as follows: <br /> 1. Remove approximately 3' of the existing soil from the <br /> building using skid loader to the exterior of the building. <br /> 2. The footings to be excavated according to the requirements <br /> of the contract. <br /> 3. The concrete footings to be placed and the foundation walls <br /> installed. <br /> 4. The foundation walls to be hackfi||ed and sub-grade back- <br /> filled using 3/4" wash stone. <br /> 5. Construction to proceed according to contractual ranuircmentv. <br /> Listed below is a breakdown of this proposal: <br /> l. Excavate from building by Roy Wilkerson using <br /> John Deere 350 loader: $ 880.0O <br /> 2. Bobcat with backhoe to assist loader: 75.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.