Browse
Search
Agenda - 08-02-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 08-02-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:53:16 PM
Creation date
4/3/2017 3:30:24 PM
Metadata
Fields
Template:
BOCC
Date
8/2/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820802
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
354 <br /> 7 �7Z <br /> ' ' - <br /> U � ��� <br /> ----' ' --' - -9�N ���.- -- July 27, 1982 <br /> PO �mYw7xC^op�nm mc2rsw/��q9�)92Y�obo ' <br /> Joseph L. Nassif, x|A <br /> P. O. Box 2615 <br /> Chapel Hill , N. C. 27514 <br /> Be: Orange County Jail Facility <br /> Hillsborough, N. C. <br /> Dear Joe, <br /> In accordance with the sub-surface exploration as prepared by <br /> Froehling & Robertson, Inc. and your instructions, we offer our proposal <br /> to remove approximately 3' of soil under the proposed slab, remove the <br /> soil that was excavated for the footing (cost of excavation for footing <br /> is not included in this proposal), fill the excavation with a suitable <br /> granular soil compacted according to the recommendations in the sub-surface <br /> exploration report for the lump sum of $8,785.00. <br /> The sequence of the excavation and backfilling is as follows: <br /> Remove approximately 3/ of the existing soil from the <br /> building using skid loader to the exterior of the building. <br /> The material to be removed from the project by truck. <br /> 2. The footings to be excavated according to the requirements <br /> of the contract. <br /> ]. The concrete footings to be placed and the foundation walls <br /> installed. <br /> 4. The foundation walls to be hackf!|l*d and sub-grade backfilled <br /> using a suitable granular fill (Chapel Hill gravel). <br /> 5. Construction to proceed according to contractual raqvircm=nts. <br /> Listed below is a breakdown of this proposal: <br /> ^ <br /> l, Equipment to excavate the unsuitable material and <br /> remove the material from the building: 516,00 <br /> 2. Labor to operate the equipment to excavate <br /> material listed in Item no. 1: 387,00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.