Browse
Search
Agenda - 07-08-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 07-08-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:30:02 PM
Creation date
4/3/2017 3:17:34 PM
Metadata
Fields
Template:
BOCC
Date
7/8/1982
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � 193 <br /> ^ '. ' <br /> 12. This <br /> Airport . el Hill. It within the distance requirements of both <br /> the City of Chapel Hill and University of North Carolina-Chapel Hill. <br /> The facilities will initially be equal to those of Horace Williams and <br /> will soon after exceed those limitations including future (|LS) In- <br /> strument Landing System. Chapel Hill and UNC have expressed the strong <br /> desire to close Horace Williams. Upon completion of the first phase <br /> of development all of the approximately 50 planes presently housed at <br /> Horace Williams could move to the new facility. After the first phase <br /> additional planes used directly by the University could be transferred <br /> when the University commits to this location. <br /> 13' The aerial photographic material submitted is according to zoning <br /> ordinance and shows 5 miles from the site and the FAA zones for this <br /> runway. <br /> 14' Runway crossover will be controlled with safety stop-go lights at <br /> crossover points coordinated with landing aircraft and supplemental <br /> shuttle buses as necessary. These will be master controlled by the <br /> fixed base operator. <br /> 15' The Obstacle Free Zone (OFZ) shown on the aerial photograph overlay <br /> and the enclosed plans will be cleared of all trees <br /> prior to completion of the runway. All land shown within the Obstacle <br /> Free Zone will be owned by the developers. <br /> '' <br /> _ ' ~ <br /> - ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.