Browse
Search
Agenda - 07-08-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 07-08-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:30:02 PM
Creation date
4/3/2017 3:17:34 PM
Metadata
Fields
Template:
BOCC
Date
7/8/1982
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
173 <br /> N-0 <br /> Ordinance requires: Findings: <br /> 6. Location of all water courses 6. There are no water courses <br /> on the site, including direction shown on the site plan. <br /> of flew. <br /> 7. Existing topography at a come. 7. Existing topography is shown. <br /> tour interval of 5' based on mean <br /> level datum. <br /> 8. Proposed or existing fencing, 8. There is no fencing in this <br /> screening, gates, parking, service project. Parking spaces are de- <br /> and storage areas. - signated. They are provided at 1 <br /> space/4 based aircraft. Service <br /> and storage areas are shown on the <br /> site plan. Maintenance facilities <br /> for aircraft will be in the build- <br /> ing designated as F.B.O Hangar and <br /> maintenance Hangars. There will be <br /> 2 wash areas at each end of air- <br /> craft storage areas. Fueling <br /> location and fuel storage area are <br /> indicated on the site plan. Screen- <br /> ing is shown on the site plan. <br /> 9. Access to site including site 9) Access to the site is shown, <br /> distances on all roads used for including the site triangles as <br /> access. required. This access shall be <br /> dedicated and built to state D.O.T <br /> Standards. <br /> 10. Elevations of all structures 10. Architectural elevations of the <br /> proposed to be used in the proposed buildings are enclosed <br /> develoment. (see appendix B). <br /> 11. Names and addresses of owners II. The name and address of the <br /> and applicants, owner have been supplied. <br /> 12. A fee, as set by the Orange 12. The application fee has been <br /> County Board of Conmissioners. paid by the applicant. <br /> The following is specific additional information required by Section <br /> 8.8.8 for General Aviation Airport Special Use Permits. <br /> 8.8.8.1 Additional Information <br /> a) A configuration diagram depicting a) A configuration diagram depicting <br /> the layout of runways, taxiways, the layout of runways, taxiways and <br /> approach zones and overrun areas. overrun areas has been supplied by the <br /> These diagrams should also be on applicant. These diagrams are also <br /> aerial photographs that show the on aerial photograPhs. The photo- <br /> area within 5 miles of the proposed graphs show the area within 5 miles <br /> site. of the site. <br /> . „ <br />
The URL can be used to link to this page
Your browser does not support the video tag.