Orange County NC Website
172 <br /> C) Method and adequacy of c) The proposed access to this site <br /> vehicle access to the site is off of Hwy. 54 110' east of the <br /> and traffic conditions around intersection of 54 and SR 1958. The <br /> the site. access road to the Airport will be <br /> built to Department of Transportati . <br /> Standards. This section off Hwy. <br /> 54 presently has 5000 motor vehicle <br /> trips/day. The additional number of <br /> trips generated by this project will <br /> be presented at the public hearing. <br /> d) Specific requirements of all d) The following are specific require- <br /> special use requests: ments for this special use request: <br /> 8,8 a) The following additional A site plan has been supplied. <br /> information is required for all <br /> Special Use Applications: <br /> Three copies of the Site Plan <br /> prepared by a registered N.C. <br /> land surveyor or engineer <br /> which shall contain the follow- <br /> ing: <br /> 1. North point scale and date. 1. North point, scale and date shown. <br /> 2. Extent of area to be develop- 2. Extent of area to be developed is <br /> ed. indicated. <br /> 3.--Locations widths of all 3. The location of all existing <br /> easements and rights-of-way rights-of-way axe shown. <br /> within or adjacent to the <br /> site. <br /> 4. Location of all existing or 4. All proposed structures are shown <br /> proposed structures on the site, on the site plan. <br /> 5. Location of all areas on the 5. There are no flood prone areas <br /> site subject to flood hazard or on the site. <br /> inundation as shown on flood <br /> maps or soil's maps. <br /> 7 <br />