Browse
Search
Agenda - 07-08-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 07-08-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:30:02 PM
Creation date
4/3/2017 3:17:34 PM
Metadata
Fields
Template:
BOCC
Date
7/8/1982
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> sXooere1y, �.` r -' `� � �� <br /> �`-�-�� ' — ' <br /> �— <br /> Bruce E. Matthews - • <br /> Airport Development Specialist <br /> n�� Mr. Fred Hazzard, Buck mountain Development co.Mr. HO=acd Robinson, FAA Atlanta ADO <br /> Mr. Cannity continued his presentation by adding that Highway 54 currently <br /> | <br /> ,us about 5,000 vehicular trips per day. <br /> Mr. Cannity said this Special Use Permit Project is essentially the same <br /> proposal that was previously submitted / March 8, 1982 Public Hearing]. Mr <br /> Cannity said Planning Staff's recommendation is the same. Mr. Cannity intro- <br /> duced the Planning Department's work on the Special Use Permit Request as.out- <br /> ined in the findings of fact and cited partiCularly those pages (62)N-24) in <br /> his book) which cited FAA circulars and airport design manuals (the findings <br /> found On pages:5/A 4.',/gof this book, as introduced by Mr. Cannity. He added one <br /> further recommended condition: <br /> Airport construction will be started within one year of final approval <br /> and all construction will be completed within two years of its initiation. <br /> Phase one will be complete 90 days after completion of the runway. Phase <br /> two will be started within 6 months after the start of construction of <br /> Phase one. Phase three will be completed within two years of the completion <br /> of Phase two. <br /> • <br /> r. Cannity noted an error in the title of a diagram found on pugo:5*3 of <br /> this book; the title should be Approach Departure Zone Dimensions. <br /> Planning Board member Kizer: Asked if HWA was a restricted airport with <br /> regard to the number of planes based there and if so, was it reasonable of Mr. <br /> Matthews to base the annual operations figures for the Midway Airport on those <br /> for HWA? <br /> Mr. Cannity: Replied that HWA was restricted and he deferred to Mr. Matthews' <br /> judgment in this "particular case," <br /> Mr. Cannity presented a letter and Resolution from the Town of Chapel Hill <br /> for the record of this public hearing at the requeot"nf that governmental unit. <br /> Commissioner Whitted announced that the letter was from Mayor Joseph Massif and <br /> was dated January 12, 1882; attached to the letter were Resolutions on HWA and the <br /> Midway Project as well as MimUtes from the-January 11, 1982, Town Council meeting. <br /> (Copies of the letter, Resolutions and Minutes are found on pages 5-6-4-4q of <br /> this book.) <br /> Mr. Kizer: Asked if Mr. Matthews wos 'present tonight. Mr. Cannity responded <br /> that Mr. Matthews was unable to attend this public hearing. <br /> This concluded the Staff's presentation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.