Orange County NC Website
228 <br /> • <br /> • <br /> c� 7 <br /> S0G%2 PAGE ail <br /> Page 197, said beginning point being the southeast corner of Tract No,Z <br /> as shown upon the Crawford Niap, and being located South'78 degrees 30 miss.30 <br /> 1I <br /> L <br /> L seconds East 1.113.0'1 feet as measured along the centerline of Highway No, 54 <br /> . <br /> ,1 from its intersection with Secondary State Road No. 1958, and North 7 degrees 3D <br /> mins. 14 errands East 60 feet from eald point in maid centerline, said right-of-way - <br /> and oasement barring a g thirty (30)foot strip immediately Wrest of the proper:l.line <br /> of the party of the first part and running an even width of thirty (30)fret west <br /> of the following line from said beginning point, running North 7 degrees 30 mfes. <br /> 14 second East 690.79 fret to the southeast corner of the lands of the party of the <br /> second part. <br /> And the party of the second part,In coneideratlorr of the foregoing <br /> grant by the party of the first part.hereby gives and grants a thirty(30) ' <br /> foot easement unto the party of the first part,its successors and assigns,the carne, <br /> beginning at the termination of the first hereinabove granted right-of-tray, <br /> the party of the second part's Southeast corner, and running thence,an even <br /> width of thirty(30) foot went of the following line,North 7 degrees 10 rains, <br /> 94 seconds Taut 817.83 feet to a point in the westm-n line of Tract No. 1 of the <br /> Crawford map,60 feet north of the ssuthwoat corner of said tract.. <br /> TO HAVE AND TO HOLD unto both of the parties hereto, the <br /> foregoing described rights-of-wa,,, and their heirs,s;:cceasora and aaaiigna, <br /> IT IS UNDERSTOOD AND AGREED that the party of the second part wil'_ <br /> be responsible for the construction of the fist hereinabovo d escr'bed roa':wey <br /> • <br /> and the,party of the Brat part will bo responsible for the construction of the <br /> •'•r <br /> second hersinebovo described right-of-way, <br /> The road shall bo for the mutual use of both of the parties hereto, <br /> their agents, servants end independent contractors. <br /> • U either party, by ib use of said road, shall render the same <br />