Orange County NC Website
AttacbMnt Yes 0 CQntact*- Kenneth R. Thompson <br /> Phme Nunbez: 732-8181 ext. 501 <br /> PURPOSE: To consider approving a chance order for additional work done to the flooring. <br /> NEED" Specification called for a cement floor with wax finish. The final floor <br /> layer was poured during early construction. As other work was done, such <br /> as by the moving In of the steel and laying of block walls, damage was <br /> done to the floor, This was in the form of holes that had to be patched <br /> and soil coloration that had to be removed through etching with acid. <br /> When it was clear that the floor would still have an irregular appearance <br /> after these measures were done and that such could pose a problem on future <br /> with epoxy p^/nn. ^ � <br /> ' - <br /> ' <br /> M5ACT- This is the first order on the project. Actual cost of doing the <br /> corrective work exceeded the $1 ,866 being billed the County. <br /> Architect recommends approval. <br /> RECOMMENDATION(S).- <br /> Approve change order Number l for the amount of $l ,866. <br />