Browse
Search
Agenda - 07-06-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 07-06-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:06:31 PM
Creation date
4/3/2017 2:41:33 PM
Metadata
Fields
Template:
BOCC
Date
7/6/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820706
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition, this Offer is made subject.to thejollcw:,o conditions: <br /> to 50% of the Non--Federal share of the eligible <br /> 1. State grant payments will be limited chevor is less- <br /> project cost or the amount Of the Grant offer, whi a for the construction of tbi <br /> 2. No grant payments are to be made until and unless permit <br /> isaudi ion an <br /> proposed wastewater collection system project is sion and approval e of an eros d sedimentation <br /> as of the <br /> 3. This offer is contingent Section of the respective field Pffir <br /> control plan by the Land Quality See <br /> Department of Natural Resources and Community Development' <br /> if at all, on or before JUL 30 L082 <br /> This offer must be accepted <br /> MAMGMW COHOSS10H <br /> FOR TMHE Sun 01:,NORTH CAROLINA, ENVIP,,ONMTAL <br /> Date: 'r <br /> Authorized State Representative <br /> h W G I 'try <br /> I ctatary <br /> rims Sect <br /> Development <br /> Name and Title' Jo,seph V. Griml 1 Resources 6 Community Devel <br /> North Carolina Department of Natura <br /> ------------ <br /> Sp <br /> .CTX0H 11 - ASSURANCES <br /> The Applicant hereby gives assurance to the Environmental, Management Commission that; <br /> have or will be approved by the Environmental <br /> A. The final plans and specifications prior to the project being <br /> Management Commission, and the applicant so notified, P <br /> ed or placed on'the market for bids. <br /> advertised <br /> contract(s) requires the contractor to furnish performance and <br /> The con than fifty pereentum (50%) <br /> bonds, each of which is in an amount Of not leas adequate <br /> payment tain during the life Of the costract($) <br /> of the contract price, and to main tion, public liability and property <br /> fire, and extended coverage, workmen's compensation, <br /> damage itlsuYance- including the letting of contracts in connection <br /> C. The construction Of the project, able requirements Of State and local laws and <br /> therewith, conforms to the applicable <br /> ordinances- d specifications Or contract(s) which <br /> D. Any change or changes in the approved plans and ans and <br /> e major alteration in the work required by the PI <br /> has made or will MaV- any oect above the latest estimate <br /> the coat of the proj <br /> specifications, or which increases Commission was or will be submitted to the <br /> approved by the Environmental Management pproval. <br /> Environmental Management Commission for Prior a <br /> E. The construction contract(s) provides that any duly authorized representative Of the <br /> State will have access to the work whenever it is in preparation or progress and <br /> that the contractor will provide proper facilities for such access and Jospection. <br /> provide and maintain competent and adequate engineering P. The applicant will construction conforms with <br /> supervi- <br /> sion and inspection Of the project to insure that the conBtru <br /> the approved plans and specifications' <br />
The URL can be used to link to this page
Your browser does not support the video tag.