Orange County NC Website
In addition, this Offer is made subject to the f OlIcW- EdIt'2MO.' eligible <br /> 1. State grant payments Will be limited to 50% Of the Non-Federal share of the P-1 <br /> project coot or the amount of the Grant offer, whichever is for lesthe construction of tht <br /> s- <br /> 2. No grant payments are to be made until and unless a permit <br /> proposed wastewater collection system project is tualled. <br /> t upon submission and approval of an erosion and sedimentation <br /> 3. This offer is cOntingen <br /> control plan by the Land Quality Section of the respective field OffiPes of the <br /> Department of Natural Resources and Community Davelop"nt- <br /> if at an, an or before <br /> This Offer mast be accepted, JUE 30 1CM2 <br /> - T M EKW CMMSSION <br /> FOR THE STATE OF NORTH CAROLINA, ENV W <br /> Dotes <br /> Authorized State Representative A q,"$4 -4 <br /> Name and Title; Jo h W. Grimaley, Secretary Ras* u. <br /> North Carolina Department 0 ices & Community Development <br /> f Natural 0 <br /> SECTION L'L - ASSURANCES <br /> ................... <br /> The Applicant hereby gives assurance to the Environmantal Management Commission that: <br /> the Environmental <br /> A. The final plans and specifications have or will be approved by <br /> Management Commission and the applicant so notified, prior to the project being <br /> adveXl�taed or placed on the market for bids. <br /> sh performance and <br /> B. The construction contract Es) requires the contractor to furssi� fifty percentUM (50%) <br /> f which is in an Mount Of not 'ago than <br /> payment bands, each 0 ain during the life Of the contract(s) adequate <br /> of the contract price, and to maint compensation, public liability and property <br /> fire, and extended coverage, workmen's <br /> damage insurance. the project, including the lotting of contracts In connection <br /> G. The construction Of to of State and local Iowa and <br /> tberewi th, conforms to the applicable requirements <br /> ordinances. a in the approved plans and specifications or contract(D) which <br /> D. Any change or change lteration in the work required by the plans and <br /> has made or will make any major a above the latest estimate <br /> specifications, or which increases the Cost Of the project 11 be submitted to the <br /> approved by the Environmental management Commisolon approval.wa or wi <br /> Environmental management Commission for prior s ad representative Of the <br /> E. The construction contract Cs) provides that any duly authorized or progress and <br /> access to the work whenever it is in preparat <br /> State will have see h <br /> that t proper facilities for such access and inspection- <br /> ile contractor will provide <br /> P. The applicant will comptent and adequate engineering supervi- <br /> provide and maintain at the construction conforms with <br /> sion and inspection Of the project to insure e th <br /> the approved plans and specifications' <br />