Orange County NC Website
ORA_NZE COUNTY <br /> ;sr <br /> BOARD OF ca-:,lissroNFRs <br /> Action A.p.;r4La <br /> Item No. B <br /> Acriag AGa.TDA ITE21 ABSTR,ACT <br /> PlEt..uLNG DATE 6/2.2/s2 <br /> 41.0 <br /> Subject: Lake Jordan allocation <br /> L_PePartnent: Planning [ Public Hearing: yes x no <br /> Attachment(s) None Information Contact: Jim Polatty <br /> • Phone Nis±er: 732-8181 MIT. 342 <br /> PURPOSE: reply to State's request as to projected water needs that could be provided <br /> from Lake Jordan <br /> NEED: The deadline for these preliminary requests for Jordan water is June 30, 1932. <br /> This data is needed for planning future allocation of the water in the region. <br /> There is no caurittrent for purchasing this water with this preliminary request. <br /> That will occur later when the formal request is rade. Aftef formal letter <br /> costs would not be incurred until water is actually withdrawn from the Lake <br /> or 1992 which ever cores first. <br /> A reeting of County water providers was held June 16, 1982 to compare estimates <br /> of future need. These estimates are now being approved by the respective <br /> Boards of Directors. It is anticipated that sore will reply to the State <br /> directly. There will also be a combined request under a County cover letteL <br /> fl5PACT: Data compilation is needed now. Any question of costs and water sharing <br /> would occur later. <br /> WIOMERDATTON: Authorize Chairran to write a letter making joint request from <br /> County. <br />