Browse
Search
Agenda - 02-16-2006-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-16-2006
>
Agenda - 02-16-2006-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:54:17 AM
Creation date
8/29/2008 9:06:05 AM
Metadata
Fields
Template:
BOCC
Date
2/16/2006
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20060216
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ADMINISTRATIVE PROCESS <br />FOR EXTENSION OF WATER AND SEWER UNDER ASSESSMENT PROJECTS <br />1. Citizens request information from staff on water or sewer availability and estimated cost of <br />extensions, <br />2. Staff prepares preliminary water or sewer layout and develops range of extension costs. <br />3. Citizens circulate petition for water or sewer service among property owners and present signed <br />petition to Board of Directors,. <br />4. Board directs statPto obtain detailed engineering study of project area. <br />5, Staff determines estimated project cost from detailed design. <br />6, Board reviews project information and determine availability of funds within adopted CIP. <br />7. Staff prepazes Preliminary Assessment Resolution for adoption by Board. Staff publishes notice <br />of public hearing and mails copies of adopted resolution to property owners in benefited area. <br />8. The Board holds public hearing. At completion of public heating, staff prepares a Final <br />Assessment Resolution and establishes the total project cost. <br />9. Board adopts Final Assessment Resolution, and staff proceeds with permitting, easement <br />acquisition and bid process, <br />10. Board awards construction contract, and project construction begins and is completed. <br />11, Staff notifies property owners that construction is complete. Property owners pay availability <br />fees and may connect to the line, <br />12. Staff accumulates cost data on project. <br />1.3. Staff prepares Preliminary Assessment Roll for adoption. Staff publishes notice of public hearing <br />and mails notices to property owners. <br />14. The Board holds public hearing. At completion of public hearing, staff prepares Final <br />Assessment Resolution for adoption. <br />15.. Board adopts Final Assessment Roll and publishes notice of its adoption, <br />16. The Authority establishes accounts for all assessed properties, and property owners make annual <br />payments, with interest, on the assessment.. Property owners must pay first installment payment <br />within 60 days after confirmation of the Final Assessment Rolh <br />Contact OWASA's Engineering Deparhnent for, further detail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.