Browse
Search
Agenda - 02-16-2006-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-16-2006
>
Agenda - 02-16-2006-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:54:17 AM
Creation date
8/29/2008 9:06:05 AM
Metadata
Fields
Template:
BOCC
Date
2/16/2006
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20060216
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~0 <br />Procedure far Assessments <br />Page 2 <br />were mailed by first-class mail and the date of such mailing shall be filed with the Board.. <br />8. At the public hearing information will be provided on the proposed assessment project, <br />Terms of the assessment will be discussed and comments will be received from all <br />interested persons who appear with respect to any matter covered by the Preliminary <br />Assessment Resolution. <br />9, Following the close of the public hearing the staff will prepare a Final Assessment <br />Resolution which the Board may adopt. The resolution shall describe the project in <br />general terms, state the basis on which the assessment will be made and give a general <br />description of the area to be assessed. In addition the resolution shall state the <br />percentage of the work to be assessed, the terms of payment and include conditions, if <br />any, under which assessments are to be held in abeyance, <br />10. Upon adoption of the Final Assessment Resolution the staff will proceed with the <br />permitting, acquisition of easements and bidding of the proposed project improvements, <br />The bids will be tabulated and presented to the Board for an award of construction. <br />11, Upon completion of the construction work the staff will accumulate all charges for the <br />project including engineering, inspections, construction, easement acquisition, legal, and <br />administrative. From this information the full cost of the project will be determined. From <br />the ftall project cost the staff will exclude engineering and inspection fees (up to 15% of <br />the construction cast), legal and easement acquisition costs (up to 5% of the construction <br />cost) and all administrative costs. The remaining amount will be the amount to be <br />assessed to the benefited parties less any contribution by the Towns or County. <br />12. The staff will notify by mail all property owners in the assessment area that the <br />constriction work has been completed and that service connections may be made to the <br />system upon payment of the appropriate availability fees, Prior to connecting to the <br />system the applicant must make arrangements with the Authority to pay these fees in a <br />lump sum or over a period of time and at an interest rate established by the Board, <br />13. When the total costs have been determined a Preliminary Assessment Roll will be <br />prepared by the staff far adoption by the Board. This roll shall contain a brief description <br />of each lot or parcel to be assessed, the amount of the assessment against each lot or <br />parcel (in practice, the Board will have established this in the adoption of the Final <br />Assessment Resolution), the terms of payment, the name and address of each lot or <br />parcel owner as indicated on the county tax records and state a time and place for a <br />public hearing on the roll. The Preliminary Assessment Roll shall be on file in the clerk's <br />office where it is available for public inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.