Orange County NC Website
~~ ~ <br />Affordable Housing <br />III.C. Costs <br />Be as detailed as possible. Add or amend categories as needed. For all * items, please add details on how <br />the costs have been estimated, The second column should cover total project costs (including those met from <br />HOME or CDBG), the third column shows how much of each line item is to be met from HOME or CDBG <br />Totals must be consistent with the sources shown in section IIIA, <br />Category <br />add/amend as needed All Costs This grant/loan <br />onl <br />construction Period <br />Acquisition $ $ <br />Relocation* $ $ <br />Demolition/Clearance $ $ <br />Site improvements* $ $ <br />Rehabilitation* $ $ <br />New construction* $ $ <br />Construction contingency $ $ <br />Architect/Engineer fees $ $ <br />Construction loan fees $ $ <br />Construction interest* $ $ <br />Construction period taxes $ $ <br />Legal/Accounting $ $ <br />Other Prof fees (Appraisal etc) $ $ <br />Agency project delivery costs (if <br />no develo er fee) $ $ <br />__ <br />Other pre-construction or <br />construction period costs: $ $ <br /> $ $ <br /> $ $ <br />Permanent <br />Permanent loan fees $ $ <br />Developer fee $ $ <br />Reserves $ $ <br />Other $ $ <br />Total Development Costs $ $ <br />