Orange County NC Website
t <br /> MAJOR SUBDI 'ION CHECKLIST � J PB• <br /> iWIE OF SUBDIVISION Hickory Hill OWNER OR DEVELOPER. Leslie Jackson <br /> ! 11929-2251 <br /> %DDRESS 122 S. Estes Dr. Suite Soo 0968-4800 <br /> COh2NSHIP chapel till TAX t4AP.7-23 BLOCK A LOT12; 2C Fire District S.. orange <br /> I r <br /> TAME OF SURVEYOR OR ENGINEER John-R. <br /> -L{! I <br /> al number of lots. 5 To be developed 1n_,]„_phase(s), Total number of acres 44.52 acres <br /> �ypi.cal dwelling units at present 0 or proposed single Family <br /> '4ATIrR SUPPLY: Public(name) Community Individual K ! <br /> SEWAGE TREATMENT: Public Community Individual, &epteic tank x SCHOOL DISTRICT Chanel bill I <br /> JAccess onto State Road 11 1009 . Road Standard: Public or Private Class A . B�,,T_I C Hickory bill Run <br /> Existing critical areas such as streams ( x �, Flood prone areas ( ), Historic Sites Other ( ), Explain: <br /> 50' Public Gas Co. Easement <br /> (Land uses in the general area: Residential A ricultu a J <br /> SKETCH PLAN RECEIVED (Date) 4-26-82 Approved ( ) Recommended Changes ( g ) <br /> PRELIMINARY PLATS RECEIVED (Date) 5-3-82 REVISED PRELIKINARY PLAN MEWED (Date) <br /> sPreliminary Review by Health Department Ron Holdway 5--3-82 Erosion Control Officer 4-27-82_wF_ <br /> Hoard•of Education Pam tja-yer 5-10-82 Department of Transportation <br /> OWASA (if pos.si.ble) <br /> Other. 'Mlephone-Carrboro 5-7-82 -Mebane (if possible)- <br /> -Hillsborough .(if possible) <br /> j -Orarge/Alamance. (if possible) <br /> jPreliminary Action by the Planning Board Unanimously rec�n& an-i yal"th,tjrap 5,41-7.181 <br /> ;Preliminary Action by the county Commissioners <br /> FINAL PLAT PXCEIVED-(Date) I <br /> �C ) All lots were -approved by the Health Department [[[[ <br /> ( ) Lots failing Health Departments approval are combined or listed properly on the plat <br /> ( ) Road Maintenance Agreement submitted (where applicable). Approved <br /> ( ) Improvements have been provided for; completed, bond, letter of credit, cash. Date <br /> i <br /> �( ) final OWASA approval (where applicable) on all plans 6 specifications. Date <br /> ( ) Final DOT approval on plat <br /> ( j Final action by the Planning Board i <br />