Browse
Search
Agenda - 02-01-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 02-01-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:14:09 AM
Creation date
3/30/2017 10:04:37 AM
Metadata
Fields
Template:
BOCC
Date
2/1/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820201
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL REPORT - THE RENOVATION OF SENIOR CITIZEN <br /> SPACE IN THE CHAPEL HILL MULTIPURPOSE CENTER <br /> All items in the attached Work Plan were completed by May 28 , <br /> 1981 . However, the manpower used to complete the renovations did <br /> change from the plan. The County Public Works purchased materials <br /> and installed the floor tile (item #2) and painted all required <br /> rooms (item #3). Udis Johnson , a Hillsborough contractor, was <br /> hired by the County to provide materials and do the following: <br /> install the drop ceiling (item #1 ) , install carpet in the lounge <br /> (item #4) , install paneling (item #5) , close off entrance between <br /> lounge and craft room (item #6 ) , cut two openings and install <br /> additional doors (item #7) , rewire new light fixtures and additional <br /> outlets (item #8) , install new cabinets (item #9) , install sinks <br /> (item #10) , install folding room dividers ( item #11 ) and put in <br /> new front entrances (item #12) . Jones Concrete Service was hired <br /> to widen outside front entrance and construct the handicapped ramp <br /> (item #13\ ^ <br /> Additional renovations of the bathrooms were done with Older <br /> American Act funds under Title IlI~C Nutrition amounting to $5000. <br /> Excluding County manpower contribution , the total costs for <br /> materials and labor for the renovation of the Senior Citizen space <br /> was $18,194. 94. The County provided the balance of funds necessary <br /> to complete the project. <br /> Prepared by Jerry Passmnre <br /> proj . Coordinator <br /> August 31 , 1981 <br /> ��m�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.