Orange County NC Website
UR -��� <br /> � <br /> MEMO TO FILE: May 22, 1981 <br /> KID SMlTH, CONTRACTOK - DWELLING UNIT #ll KATIE MCNEIL <br /> This contractor to me seems not to know in what order to go about doing his <br /> work. The job in which he was awarded called for new shingles and felt and <br /> also new ceiling ti]es. This contractor installed all ceiling tiles before <br /> removing and replacing felt and shingles which would have ruined the tile had <br /> it rained. There was a bathroom to be installed, the contractor put up his <br /> tile board before roughing in his plumbing work and had to remove most of it <br /> in order to plumb for his fixtures. Obviously, most of the contractor's helpers <br /> knew less about building then the contractor himself. One helper was trying <br /> to patch some holes about six or eight inches in a gypsum board wall by <br /> _covering the hole with only tape and joint compound, which I had to have him <br /> remove. The contractor could not weatherstrip a door without help which the <br /> other Rehab Specialist, Leroy Whitmore gave him. The contractor lost and <br /> -wasted to much time which the owner complained about to me. This time lost <br /> caused the contractor to run over his bidded days, I would suggest that he <br /> not be invited to bid on any other job in this program. There are some home <br /> owners in the community that feel the same as self. <br /> - - <br /> Rehab Specialist <br /> . . - <br />