Browse
Search
2017-109-E SW - SCS Engineers, PC - Consent to void earlier contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-109-E SW - SCS Engineers, PC - Consent to void earlier contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 4:46:14 PM
Creation date
3/14/2017 4:06:59 PM
Metadata
Fields
Template:
Contract
Date
3/1/2017
Contract Starting Date
12/28/2016
Contract Ending Date
3/1/2017
Contract Document Type
Contract Amendment
Amount
$0.00
Document Relationships
2016-188-E Solid Waste - SCS Engineers, PC for preparation of Solid Waste Financial Plan
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
R 2017-109-E SW - SCS Engineers, PC - Consent to void earlier contract
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7F897FB2-8130-4E97-ACA1-2F204BB1 F61 E <br /> SCS°ENGINEERS <br /> Landfill. SCS will evaluate factors such as surrounding zoning and land use, traffic <br /> compatibility, and proximity to existing centralized operations and fleet yards in the context <br /> of these previous activities. Protected settings such as historical sites, archaeological areas, <br /> prime farmland, nature preserves and parks will also be identified if in close proximity to a <br /> candidate site. <br /> Using the needs, specifications, and conceptual design components along with additional <br /> criteria established by the County and Towns during Tasks 1 through 3, each site will be <br /> assessed for suitability for use as a location for the Facility. Based on the results of these <br /> evaluations, SCS will develop a Preliminary Site Evaluation Report. SCS will also prepare a <br /> presentation containing the findings of the Report and make a presentation at a SWAG <br /> meeting at a future date not included in previous tasks. <br /> Task 5 —Entsorga MBT Preliminary Feasibility Study <br /> During the timeframe of 2010-2012 when the region was conducting initial investigations <br /> into potential long-term solid waste disposal solutions to replace the function of the Orange <br /> County Landfill, the County became aware of MBT (Mechanical Biological Treatment) <br /> technology introduced by Entsorga Italia S.p.A and Chemtex Global N.V. SCS conducted a <br /> cursory review of this technology during the development of the Town of Chapel Hill's <br /> Comprehensive Review of Solid Waste Collection and Disposal Options. In this high <br /> efficiency biological treatment (HEBIOT)process, an aerobic digestion module is utilized to <br /> drive off moisture from waste that has been shredded, and the resulting produced solid <br /> recovered fuel (SRF) can be used in a combustion process to produce electricity. At the <br /> time,there was no pilot facility in the United States that could serve as an example of the <br /> viability of the technology. In recent years, construction was initiated on an Entsorga plant in <br /> Martinsburg, WV. The University of North Carolina—Chapel Hill (UNC) coal combustion <br /> power plant has already been identified as a potential recipient of the SRF product. <br /> SCS will review available information and data provided by Entsorga regarding the <br /> development of a potential MBT project in Orange County. In addition, SCS will develop a <br /> preliminary pro forma model to evaluate potential tipping fees, CAPEX, and OPEX costs. <br /> SCS will communicate with UNC representatives as necessary and contact information will <br /> be provided by the County. A brief analysis will detail some of the parameters of the <br /> relationship between Entsorga, UNC, and the County. The results of this evaluation will be <br /> summarized in a Letter Report to the County. <br /> Task 5 will be completed simultaneously with Tasks 2, 3, and 4. The Entsorga Facility will <br /> not be a consideration during the Task 1 Needs Assessment. SCS will evaluate and assess <br /> the feasibility of an Entsorga plant concurrent with the evaluations and assessments of the <br /> Integrated Materials Management Facility, to include the preliminary economic analysis, <br /> preliminary performance specifications, and preliminary site evaluations (SCS will review a <br /> preliminary conceptual design plan of the Entsorga Facility provided by that Facility's <br /> developers,but will not develop its own). SCS will also develop the Letter Report <br /> concurrently with other deliverables during performance of the other three tasks; however, <br /> the Letter Report developed under Task 5 will be submitted as a separate deliverable. <br /> #02238216 12/27/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.