Orange County NC Website
• <br /> Onamge County 94eoPth CDepcuttment <br /> 35 <br /> Daniel B. Reimer, MPH,Director <br /> ENVIRONMENTAL HEALTH DIVISION 0101. <br /> PERSONAL HEALTH DIVISION <br /> c). <br /> ANIMAL.CONTROL DIVISION ,. <br /> DENTAL HEALTH DIVISION <br /> P.O,Box 8181,306C Revere Rd. *4.4'g'i rfrf—.4' ‘9, 77.7. c P.O.Box 8181.300 W.Tryon St. <br /> Hillsborough,N.C.27278 • <br /> - - D :Hillsborough,N C.27278 <br /> 4•;•1 <br /> HILLSBOROUGH CHAPEL HILL MEBANE DURHAM <br /> ft exceV <br /> (919)732-8181 (919)9E7-9251 0 (919)227-2032 (919)668-7333 <br /> MEMORANDUM <br /> TO: EMILY CRUDUP <br /> FROM: RON HOLDWAY <br /> DATE: JUNE 23, .1989 <br /> RE: SOILS INVESTIGATION AT MCCLENNON'S FARM <br /> This department has conducted soil evaluations on the site for the <br /> proposed McClennon's Farm project on Bowden Road (7.115. .24) starting <br /> in 1987. Steve Steinbeck with the Division of Health Services also <br /> evaluated the site because of the size of proposed system. <br /> The site has been approved preliminarily for a system with a maximum <br /> daily design flow of 5880 gallons per day. The maximum loading rate <br /> or long term acceptance rate of the LPP field would be .1 gallons <br /> per day per square foot of field area. The total approved area <br /> identified by the field investigations was approximately 140,000 <br /> square feet. <br /> Before any permits could be issued by our department for the <br /> construction of the system, detailed engineering plans for the system <br /> would have to be submitted to our office and to DHS for review and <br /> approval. <br /> I have asked for Mr. Steinbeck to foward a copy of his field report <br /> to us. I will deliver a copy of that report to you as soon as it <br /> is available. <br /> Please call if you have any questions concerning this matter. <br /> SOUTHERN ORANGE OFFICE: Carr Mill Mall, Suite 225, 100 N.Greensboro St.. Carrboro,N.C.27510. (919)942-4168 <br />